My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRHC Minutes 2004-2010
Clerk
>
Minutes
>
CRHC Minutes 2004-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:12:18 PM
Creation date
8/5/2010 12:13:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development. Phase I is sold out and Phase ! I is currently under <br />construction, <br />~ City Place - an ~ S-sure mixed-use project at Main street and Memory <br />Lane, Leases have been signed with McCormick and chmick's <br />Beafood Restaurant, geisha douse and Bank of the vilest, A 3-story <br />residential tower is proposed and is currently under review. <br />• Geneva Commons - a luxury high-rise condominium project at <br />MacArthur Place which has received all City approvals. <br />• Nexus Development ~ a luxury high~rise and low-rise condominium <br />project at MacArthur Place, which has received all City approvals and is <br />currently under construction, its emphasis is on integrating housing <br />and services within an office campus to promote an urban living <br />environment, <br />• Cordoba - a mixed~ue courtyard housing project designed by Mouse ~ <br />Polyzoide and approved by City Council. Construction will begin soon, <br />~ on June 24, ~00~, Steve PonTell of the La Jolla institute facilitated a <br />City Council study Bession on Development, where Council identified <br />Santa Ana BoulevardlDowntowr~~ North Main BtreetlTriangle <br />Neighborhoodlain Place, and East ~ ~t and ~`" street Corridor as <br />priority focus areas for further action, A follow-up discussion to the <br />study session was held in october X005. <br />~ ~ Banta Ana Renais~nce ioecific Plan ~ This is a plan for the future of <br />the City's core which includes the area from the Depot through <br />Downtown to the Civic Center, City Council approvasi a contract with <br />Moule & Polyzoides in February X00. Discovery Uvorkshops were held <br />on April ~ 8, ~o, and 2~ . A Design Charette was held on sUlay 8 through <br />'i , ~OOG. A draft plan is under development, More information will <br />follow, <br />• Metro East Mixed-Use overlay Zone -zoning and an EIR are being <br />prepared to analyze residentiallmixed-use development in the study <br />area. The First and Cabrillo Towers development proposal is being <br />reviewed. A Public Bcoping meeting was held on March ~~, ~oO. <br />• First and Cabrillo Towers by NDC Development - a ~-acre mixed-use <br />project at First and Cabrillo Park, which is in site plan review, <br />~SICFLLAN~oU ADI[NITRAT[oN <br />~, ~IToRI RE~URCE COMMMIION ~i-{RC}UPDATE-Commissioner <br />>~lichael Nacres <br />Commissioner Nacres mentioned the discussion on the replacement of doors <br />and windows for the Basler Mouse on North Broadway, <br />CRHC MINUTES ~ ept~mher ~~, 2~0~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.