My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2025
>
2025-041 - Certifing Final Supplemental Enviromental Impact for The Village
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:52:20 AM
Creation date
9/25/2025 9:50:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
consideration in an EIR are: (i) failure to meet most of the basic project objectives, <br /> (ii) infeasibility, or(iii) inability to avoid significant environmental impacts. <br /> The range of alternatives required is governed by a "rule of reason" that requires the EIR to set <br /> forth only those alternatives necessary to permit a reasoned choice. The EIR shall include <br /> sufficient information about each alternative to allow meaningful evaluation, analysis, and <br /> comparison with the proposed Project. Alternatives are limited to ones that would avoid or <br /> substantially lessen any of the significant effects of the Project. Of those alternatives, the EIR <br /> need examine in detail only the ones that the lead agency determines could feasibly attain most <br /> of the basic objectives of the Project. <br /> As set forth in these findings, the implementation of the Project would not in result in significant <br /> impacts that are considered unavoidable, with the exception of impacts related to recreation. In <br /> making the alternatives findings below, the City of Santa Ana certifies that it has independently <br /> reviewed and considered the information on alternatives provided in the EIR, including the <br /> information provided in the comments on the Draft Supplemental EIR and the responses thereto. <br /> 9.1 DISCUSSION OF ALTERNATIVES CONSIDERED BUT REJECTED <br /> Section 15126.6(c) of the State CEQA Guidelines specifies that an EIR should (1) identify <br /> alternatives that were considered by the lead agency but were eliminated from detailed <br /> consideration because they were determined to be infeasible during the scoping process; and (2) <br /> briefly explain the reasons underlying the lead agency's determination. Among the factors that <br /> may be used to eliminate alternatives from detailed consideration in an EIR are: (i)failure to meet <br /> most of the basic project objectives; (ii) infeasibility; and/or (iii) inability to avoid significant <br /> environmental impacts. <br /> Alternatives that were considered but rejected during the scoping process for detailed evaluation <br /> in Section 6.5 Alternatives Considered but Rejected of the Draft Supplemental EIR are <br /> discussed below: <br /> 9.1.1 Buildout of the Zoning Designation Alternative <br /> The Buildout of the Zoning Designation Alternative would entail buildout of the project site <br /> pursuant to the standards and regulations in the City's SD-48, amended in January 1989.' The <br /> SD-48 permitted uses include, but are not limited to, retail specialty, office, restaurants, specialty <br /> markets, beauty salons, banks, and theaters. Conditional uses permitted included live dance <br /> entertainment and alcoholic beverage sales. The SD-48 also includes development standards for <br /> parking for land use types, building setbacks (at a minimum of 15 feet), height (at a maximum of <br /> 35 feet), landscaping, signage, and building uses. The project site is currently occupied by the <br /> South Coast Plaza Village commercial center on both sides of South Plaza Drive which consists <br /> of approximately 164,049 square feet of retail shops and restaurants, offices, and the Regency <br /> Theatres cinema building.The majority of the buildings are at the maximum height of 35 feet.The <br /> property also provides surface parking, a variety of trees and a half-acre open space lawn area. <br /> Therefore, the existing development at the project site is reflective of the standards established <br /> under SD-48. It is not realistic that the site would be redeveloped with new or modified commercial <br /> uses consistent with the existing SD-48 zoning. Additionally, the permitted uses under the SD-48 <br /> do not allow for residential, office, or open space uses. <br /> 1 City of Santa Ana, January 17, 1989, Specific Development No. 48,Amendment Application 1017 NS-1997. <br /> Resolution No. 2025-041 <br /> Page 98 of 140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.