My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, CITY OF (7)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, CITY OF (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 4:51:23 PM
Creation date
10/3/2025 4:49:36 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, CITY OF
Contract #
A-2025-131
Agency
Public Works
Council Approval Date
8/5/2025
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-2025-131 <br /> Docusign Envelope ID:3A3B67D0-EC29-4F8F-B94A-1 BF790DA2342 <br /> INSURANCE NOT REQUIRED <br /> WORK MAY PROCEED <br /> CITY CLERK AG R- Initial <br /> DATE: ' COOPERATIVE COST REIMBURSEMENT AGREEMENT <br /> OCT Q 3. 2025 <br /> PWr (2) MAIN STREET SLURRY SEAL AND RESURFACING PROJECT <br /> V cctrdo?erez(Dz) <br /> COOPERATIVE COST REIMBURSEMENT AGREEMENT ("Agreement"), is made and entered <br /> into this 17th day of September , 2025, by and between the CITY OF SANTA ANA, a <br /> California charter city ("Santa Ana"), and the CITY OF ORANGE, a California municipal <br /> corporation ("Orange"). In this Agreement, Santa Ana and Orange may each be individually <br /> referred to as a "Party" and collectively referred to as the "Parties." <br /> RECITALS: <br /> WHEREAS, Santa Ana has initiated a street rehabilitation project(the"Project")to improve <br /> the pavement condition of Main Street from Memory Lane to North City Limits. <br /> WHEREAS, Main Street within the Project limits contain a portion of property within Santa <br /> Ana and a portion of the street within the boundary of Orange; and <br /> WHEREAS, In an effort to efficiently utilize Orange resources, Orange wishes to improve <br /> the portion of Main Street within its boundary at the same time the Santa Ana Main Street Slurry <br /> Seal and Resurfacing Project are conducted; and <br /> WHEREAS, the Parties desire to repave Main Street, within their respective boundaries <br /> as part of the "Project". <br /> NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable <br /> consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties <br /> agree as follows: <br /> 1. The City of Santa Ana will advertise for bids, hire a contractor, approve the work and administer <br /> the contract for street rehabilitation. <br /> 2. Orange is responsible for: <br /> (a) Orange shall pay Santa Ana for the actual cost of the work within the Orange portion <br /> based upon unit prices bid of the Successful Contractor and quantities actually used <br /> on the Orange portion as set forth in the Project Location Map (Exhibit A) and the City <br /> Cost Sharing (Exhibit B), attached hereto and incorporated by this reference. Orange <br /> will remit payment to Santa Ana within thirty(30) days of receipt of invoice evidencing <br /> Project work performed within Orange city boundary. <br /> (b) Orange shall pay Santa Ana for the actual cost of design engineering and construction <br /> engineering services provided for the work within the Orange portion based upon the <br /> time spent by Santa Ana staff. Orange will remit payment to Santa Ana within thirty <br /> (30) days of receipt of invoice evidencing Project work performed within Orange city <br /> boundary. <br /> 3. Orange will coordinate the relocation of all affected utility company facilities within the City limits <br /> of Orange in a timely manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.