My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />Capacity of systems subject to increased infiltration and inflow due to larger and/or <br />higher-intensitystorm events as a result of climate change; <br />Increases of erosive forces in canyons and streams near underground and above- <br />ground system componentsdue to largerand/or higher-intensitystormevents; <br />Capacity of major system elements to accommodate dry weather peak flow <br />conditions,and updated design storm and wet weather events; and <br />Necessary redundancy in pumping and storage capacities. <br />8.3.Prioritization of Corrective Action <br />The findings of the condition assessments and capacity assessments must be usedto <br />prioritizecorrective actions.Prioritizationmust consider the severity of the <br />consequences of potential spills. <br />8.4.Capital Improvement Plan <br />The capital improvement plan must include the following items: <br />Project schedules including completion dates for all portions of the capital <br />improvement program; <br />Internal and external project funding sources for each project;and <br />Joint coordination between operation and maintenance staff, and engineering <br />staff/consultants during planning, design, and construction of capital improvement <br />projects; andInteragency coordination with other impacted utility agencies. <br />9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS <br />ThePlanmust include an Adaptive Management section that addresses Plan- <br />implementation effectiveness and the steps for necessary Plan improvement, including: <br />Maintaining relevant information, including audit findings, to establish and prioritize <br />appropriate Plan activities; <br />Monitoringtheimplementation and measuring the effectiveness of each Plan <br />Element; <br />Assessing the successofthe preventive operation and maintenanceactivities; <br />Updating Plan procedures and activities, as appropriate,based on results of <br />monitoring and performance evaluations; and <br />Identifying and illustrating spill trends, including spill frequency, locations and <br />estimated volumes. <br />ATTACHMENT D SEWER SYSTEM MANAGEMENT PLAN <br />REQUIRED ELEMENTSDecember 6,2022 <br />D-9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.