My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Upon arriving at the spill location, the on-call duty water employee shall call the on-call <br />Supervisor/Crew Leadera second time and report the spill status.He shall then; <br /> Take immediate action to contain the spill to prevent sewage from entering storm <br />drains, channels or other critical infrastructure. <br /> <br /> Establish perimeters and control zones with cones, barricades, vehicles or terrain. <br />(KEEP OUT ZONE) at all times. <br /> <br /> Collect representative photos of the spill location and flow rates. <br /> <br /> Notify the appropriate authorities. Refer to Appendix B, Sanitary Sewer Overflow <br />Reporting Guidelines. <br />Small spills can often be contained with sand berms. The additional personnel called out <br />to assist the on-call duty water employee with the spill, shall make sure to have shovels <br />and sand available on the bobtail truck used to respond to spills. <br />Medium spills may be contained with large sand berms, in strategic locations. Medium <br />size spills may also require vacuuming and hauling the sewage or pumping the sewage <br />to a sewer manhole for disposal, to prevent sewage from flowing over dikes. Use plastic <br />sheeting to block storm drain inlets and other critical locations. Call the on-call <br />Supervisor/Crew Leader for direction and support. <br />Large spills (spills more than a few gallons per minute that are likely to reach a storm <br />drain inlet) in the public right of way may require various actions for containment, as <br />follows: <br />Build large sand berms to contain sewage. <br />Block storm drains at inlets or at manholes at critical line intersection locations. <br />Block sewage flow in channels with berms. <br />Call contractor for vacuum trucks to remove sewage off site and for disposal. <br />(At the discretion of the water maintenance supervisor and/or crew leader on- <br />call). <br />o Houston Harris, PCS at (909) 721-1756 <br /> <br />Use a sewer pump and hoses to pump to a sewer manhole. <br />Contact OCSD maintenance personnel for on-site support with vacuum trucks and <br />other equipment as needed, if contractors are not available. <br />Contain the sewage in a low area. <br />Estimate the rate of overflow. <br />Call the on-call Supervisor/Crew Leader for direction and support. <br /> <br />REVISION 2.0 (4/23) 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.