My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Collection System Collaborative Benchmarking Group <br />Best Practices for Sanitary Sewer Overflow (SSO) Prevention and <br />Response Plan <br />The formula used to develop Table B for estimating SSOÓs out of maintenance <br />holes without covers is based on discharge over curved weir -- bell mouth <br />spillways for 2Ñ to 12Ñ diameter pipes. The formula was taken from hydraulics <br />and its application by A.H. Gibson (Constable & Co. Limited). <br /> <br /> <br /> <br />Example Overflow Estimation: <br /> <br />The maintenance hole cover is off and the flow coming out of a 36Ñ frame <br />maintenance hole at one inch (1Ñ) height will be approximately 660 gallons per <br />minute. <br />FLOW OUT OF M/H WITH COVER REMOVED (TABLE "B") <br />Height to be measured <br />This sanitary sewer overflow drawing was developed by Debbie Myers, Principal <br />Engineering Technician, for Ed Euyen, Civil Engineer, P.E. No. 33955, California, <br />of County Sanitation District 1. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.