My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER <br /> <br />prioritization of system repairs and maintenance to proactively prevent spills, and <br />(2) address the implementation of current standard industry practices through available <br />equipment, technologies,andstrategies. <br />For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation <br />of Existing Regulatory Coverage, per section 2.1(Requirements for Continuation of <br />Existing Regulatory Coverage) of this General Order: <br />Within six (6) months of the Adoption Date of this General Order: <br /> The Legally Responsible Official shall upload Sewer System <br />Management Plan to the online CIWQS Sanitary Sewer System Database. <br />For a new Enrollee: <br />Within twelve (12) months of the Application for Enrollment approval date: <br /> The governing entity of the new Enrollee shall approve its Sewer System <br />Management Plan; and <br /> The Legally Responsible Official shall certify and upload its Sewer System <br />Management Plan to the online CIWQS Sanitary Sewer System Database. <br />5.3. Certification of Sewer System Management Plan and Plan Updates <br />The Legally Responsible Official shall certify and upload its Sewer System Management <br />Plan and all subsequent updates to the online CIWQS Sanitary Sewer System <br />Database. <br />5.4. Sewer System Management Plan Audits <br />The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and <br />implementation of its Plan, at a minimum frequency of once every three years. The audit <br />must be conducted for the period after the end of the required audit <br />period. Within six months after the end of the required 3-year audit period, the <br />Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary <br />Sewer System Database per the requirements in section 3.10 (Sewer System <br />Management Plan Audit Reporting Requirements) of Attachment E1 of this General <br />Order. <br />Audit reports submitted to the CIWQS Sanitary Sewer System Database will be <br />viewable only to Water Boards staff. <br />The internal audit shall be appropriately scaled to the size of the system(s) and the <br />number of spills. Tmust be involved in completing <br />the audit. At minimum, the audit must: <br /> Evaluate the implementation and effectiveness of Sewer System <br />Management Plan in preventing spills; <br /> Evaluate the Enrollee compliance with this General Order; <br /> Identify Sewer System Management Plan deficiencies in addressing ongoing spills <br />and discharges to waters of the State; and <br /> <br />ORDER 2022-0103-DWQ December 6, 2022 <br />19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.