My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER <br /> <br />Initial Audit Period for Transition from 2-Year Audit Required in Previous <br />Order 2006-0003-DWQ to 3-Year Audit Required in this General Order <br /> Audit Period Audit Due Date <br />An Enrollee <br />Within six months <br />previously A 3-year period starting from the end of <br />after end of 3-year <br />regulated by Order last required 2-year Audit Period <br />Audit Period <br />2006-003-DWQ <br />Last required Audit Period start date of <br />August 2, 2021; <br />Example February 1, 2025 <br />Audit Period of August 2, 2021 through <br />August 1, 2024 <br />Three-Year Ongoing Audit Period <br /> Audit Period Audit Due Date <br />Within six months <br />A 3-year period starting from the end of <br />Each Enrollee after end of 3-year <br />last required Audit Period <br />Audit Period <br />5.5. Six-Year Sewer System Management Plan Update <br />At a minimum, the Enrollee shall update its Sewer System Management Plan every six <br />(6) years after the date of its last Plan Update due date. (For an Enrollee previously <br />regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due <br />date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and <br />Recordkeeping Requirements) of this Order. The Updated Sewer System Management <br />Plan must include: <br /> Elements required in Attachment D (Sewer System Management Plan Required <br />Elements) of this Order; <br /> Summary of revisions included in the Plan update based on internal audit findings; <br />and <br /> Other sewer system management-related changes. <br />The s governing entity shall approve the updated Plan. The Legally <br />Responsible Official shall upload and certify the approved updated Plan in the online <br />CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer <br />System Management Plan Reporting Requirements) of Attachment E1 (Notification, <br />Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During <br />the time period in between Plan updates, the Enrollee shall continuously document <br />changes to its Sewer System Management Plan in a change log attached to the Plan. <br /> <br />ORDER 2022-0103-DWQ December 6, 2022 <br />21 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.