My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of on -site consumption of prepared food, and other conditions, has changed since the <br />granting of the waiver such that the FSE is contributing to FOG discharges. <br />(2) Adequacy of implementation and compliance with BMPs. <br />(3) Change in sewer size, grade, and condition based on visual information. <br />(4) Changes in operations that significantly affect FOG discharge. <br />(5) Failure to comply with any of the conditions set forth in the waiver. <br />(6) Any other condition deemed reasonably related to the generation of FOG <br />discharges by the FOG control program manager. <br />Sec. 39-56.5. - Same —Grease interceptor requirements. <br />(a) All interceptors shall be of an approved type and adequately sized in <br />conformance with the current edition of the California Plumbing Code and shall be <br />installed, operated, and maintained as necessary to maintain compliance with the <br />objectives of this section. <br />(b) Fixtures, equipment, and drain lines located in the food preparation and <br />cleanup areas of FSEs that are sources of FOG discharges shall be connected to the <br />grease interceptor. <br />(c) Grease interceptors shall be constructed in accordance with the design <br />approved by the FOG control program manager and in accordance with the current <br />edition of the California Plumbing Code design requirements and shall have a minimum <br />of two (2) compartments with fittings designed for grease retention. <br />(d) The grease interceptor shall be installed at a location where it shall be at <br />all times easily accessible for inspection, cleaning, and removal of accumulated grease. <br />(e) Access manholes, with a minimum diameter of twenty-four (24) inches, <br />shall be provided over each grease interceptor chamber and sanitary tee. The access <br />manholes shall extend at least to finished grade and be designed and maintained to <br />prevent water inflow or infiltration. The manholes shall also have readily removable <br />covers to facilitate inspection, grease removal, and wastewater sampling activities. <br />Sec. 39-56.6. - Same —Grease interceptor maintenance requirements. <br />(a) Grease interceptors shall be maintained in efficient operating condition by <br />periodic removal of the full content of the interceptor. The maintenance frequency for all <br />FSEs with a grease interceptor is specified in the rules and regulations. <br />Ordinance No. NS-2921 <br />Page 47 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.