My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Notes for Public Works Permitted Work on Sewer Collection System <br />1. Construction and installation of all sewer mains and appurtenances shall be in accordance with <br />the City of Santa Ana Standard Plans and Specifications. Where the standard plans are silent, <br />construction and installation of sewer mains and appurtenances shall conform to the Standard <br />Specifications for Public Works Construction, 2012 edition. <br />2. Construction of sewer mains and appurtenances shall only be performed by qualified <br />contractors with a valid California Contractor A or C34 license. <br />3. All newly constructed sewer mains and appurtenances shall be tested in accordance with <br />Standard Specifications for Public Works Construction. All newly constructed sewer mains, <br />laterals and manholes must be inspected via closed circuit television camera by a National <br />Association of Sewer Service Companies (NASSCO) certified technician and video submitted in a <br />digital format to the Water Resources Division for review and final acceptance of work. <br />4. All sewer mains shall be vitrified clay pipe (VCP) or PVC SDR-26 pipe. All other pipe materials <br />require special review and approval from the Water Resources Division. <br />5. Trench plates shall be flush with pavement and shall be non-skid. <br />6. Contractor to verify depth and location of all utilities and points of connection prior to trenching. <br />7. When public sewer facilities are located on private property, easement documents are to be <br />submitted to City for approval prior to a permit being issued. <br />8. Final acceptance will not occur until original record drawings on mylar and digital format are <br />delivered to and accepted by the City's inspector. Show all field changes on record drawings. <br />9. All sewer repairs shall be accomplished using stainless steel double banded couplings. <br />"ADD ALL NOTES TO PLANS" <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />DATE I i REVISION STD. PLAN <br />11116 R.R. NEW <br />1/2020 R.R. UPDATED SEWER CONSTRUCTION NUMBER <br />1 /20 <br />GENERAL NOTES 1200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.