My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN VIEW <br />SEWER LATERAL TIE-IN <br />y_1:18Ti9N1 <br />BACKFILL: <br />IAIN NATIVE MATERIAL <br />COMPACTED TO 90% <br />Ie1�1�1�1 ,I, <br />....:..:..:.. ..:. <br />PROFILE VIEW <br />CONSTRUCTION ITEMS / MATERIALS LIST <br />NO. <br />SIZE AND DESCRIPTION <br />MANUFACTURER/MATERIAL <br />MFR. CAT. NO. <br />�1 <br />CAST IRON FRAME AND COVER <br />ALHAMBRA FOUNDRY <br />A-2100 <br />2�HDPE <br />SEWER PIPE <br />4' (MIN.) IF SERVING 4 DWELLINGS OR LESS <br />-6" (MIN.) ALL OTHER CASES <br />HDPE (HIGH DENSITY POLYETHELYNE) <br />DR-17 <br />O <br />INNER SURFACE- REFLECTIVE COATING <br />3 <br />CLEAN OUT, 4", DR11 IPS <br />P & F DISTRIBUTORS OR APPROVED EQUAL <br />40040010 <br />4 <br />TWO-WAY TEE, DR 17 <br />P & F DISTRIBUTORS OR APPROVED EQUAL <br />5 <br />REDUCER (IF NECESSARY) <br />SDR-26 OR DR-17 <br />6 <br />COUPLING ADAPTER (IF NECESSARY) <br />7 <br />CONSTRUCT CONCRETE SIDEWALK PER CITY STD. PLAN 1104, SEE NOTE 4 <br />8 <br />F-911 <br />CONSTRUCT WYE AND MATCH EXISTING SEWER MAIN MATERIAL <br />10 <br />45* ELBOW SHALL MATCH WYE MATERIAL <br />NOTES: <br />1, WATER RESOURCES DIVISION SHALL REVIEW AND APPROVE OF PIPE BURSTING <br />METHOD PRIOR TO CONTRACTOR COMMENCING WORK. <br />2. ALL HDPE JOINTS SHALL BE FUSED. <br />3. CONTRACTOR SHALL REMOVE THE FUSION "BEAD" FROM INSIDE OF PIPE USING <br />APPROPRIATE CUTTING TOOL. <br />4. SIDEWALK SHALL BE REPLACED FROM SCORE JOINT TO SCORE JOINT OR A MINIMUM <br />OF 4 FEET BUT IN NO CASE SHALL FLOATING SECTION BE LESS THAN 4 FEET. <br />DATE: ( 11Z� I o CITY OF SANTA ANA 0 <br />PUBLIC WORKS AGENCY <br />REVISION STD. PLAN <br />FAIL SEWER LATERAL NUMBER <br />AND CLEANOUT 1204A <br />(PIPE BURSTING) <br />
The URL can be used to link to this page
Your browser does not support the video tag.