My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />APPENDIX I <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br />upstream of the pump shall also be considered as potential odor sources due to the blocking <br />off of the airflow in the headspace of sewer. <br />The Contractor shall submit the following as part of the Sewer Bypass Plan: <br />Plans showing the details of each installation site. For bypass pumping, the plans <br />shall include the arrangement of the temporary pumping equipment, location of <br />suction and discharge points, routing of bypass piping, method of protection of <br />equipment and piping from traffic, and whether the piping is buried, exposed or <br />pipe ramps. <br />• For gravity bypasses, the plans shall include locations of temporary flow -through <br />plugs, sewer plugs and bypass discharge piping. <br />• A description of how the bypass system will be controlled and operated. Describe <br />the method of control, the procedure and time requirements for switching to the <br />standby equipment and alarm notification. <br />• Capacities of pumps, prime movers and standby equipment. Design calculations <br />proving adequacy of the bypass system and selected equipment. <br />• Standby power source for bypass pumping. <br />• Staffing plan for maintaining equipment for 24-hour continuous, reliable operation <br />on weekdays and/or weekend days. <br />• Noise and Odor Control Plan. <br />• Plan showing the existing sewer line and the proposed points of now interruption <br />and/or flow diversion. <br />• Construction time schedule showing anticipated times of flow interruption and/or <br />flow diversion. <br />• Spill Contingency Plan detailing precautions to be implemented to prevent sewage <br />spills including specific responses and control measures to follow during an <br />overflow resulting from breakage or blockage and maintenance and inspection <br />schedules to detect potential problems to mitigate the potential release resulting <br />from overflows, bypass pipe ruptures, and blockages. <br />The Contractor shall provide temporary pumps, conduits, and other equipment to bypass <br />the sewer flow. Engine -driven pumps shall be equipped with mufflers and/or shall be <br />enclosed to keep the noise level within the City's Noise Ordinance. Pumps and bypass <br />lines shall be of adequate capacity and size to handle the flows. <br />Bypass duty and standby pumps shall be designed for raw sewage applications, resistant to <br />ragging, and capable of passing a 3-inch solid sphere. Pumps shall be self -priming with <br />
The URL can be used to link to this page
Your browser does not support the video tag.