My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE HAULER RECEIPT <br />DOCUMENTATION REQUIREMENTS <br />The minimum information requirements to be documented on the hauler's receipt are: <br />• Name of hauling company <br />• Name and signature of operator performing the pumpout <br />• Documentation of full pumpout with volume of water and FOG removed (e.g., 1500 <br />gallons) <br />• Documentation of the level of floating FOG and Settled Solids (to determine if <br />volume exceeds 25% capacity of the grease removal equipment) <br />• Documentation if repairs to the grease interceptor are required <br />• Identification of the facility where the hauler is planning to dispose of the waste <br />
The URL can be used to link to this page
Your browser does not support the video tag.