My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 07 - Sewer System Management Plan 2025 Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025 Regular
>
Item 07 - Sewer System Management Plan 2025 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:52:12 AM
Creation date
10/15/2025 8:43:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
07
Date
10/21/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Customer <br />Request <br />Mainline CCTV <br />Findings <br />LID Residential or <br />Non-FSE <br />Commercial <br />Process Flow <br />HD Residential <br />Process Flow <br />Yes No <br />LID Res or NO <br />Non-FSE FSE? <br />Comm? <br />Repair/Replace <br />Required? <br />No <br />Perform Lateral <br />Repair/Replace <br />No <br />Issue CW <br />YeS Preliminary Yes <br />Lateral <br />Yes Lateral <br />NO <br />Revocation Warning <br />Follow-up <br />Assessment <br />Impacted <br />Repair/Replace <br />Letter/Schedule <br />CCTV <br />Complete? <br />By FOG? <br />Required? <br />Follow-up <br />CCTV (2-3 mos) <br />No <br />Yes <br />Request Clean/CCTV <br />from Customer (Verbal) <br />Perform Lateral <br />Provide education (flyer) Repair/Replace <br />to Customer Process Flow <br />issue corrective <br />SSO Event 10 SSO Response Public SSO? NO Actions Letter to <br />Process Flow Private Property <br />Owner(s) <br />Yes <br />Follow-up/ <br />Characterization <br />Process Flow <br />FOG Compliance <br />Inspection <br />n-Compliai <br />Identified? <br />YNO <br />Y2S Warnings/NOVs/ <br />Citations <br />Santa Ana Enforcement/Lateral Evaluation Process Flow — Draft <br />7/15/2009 <br />Impacted <br />No Further <br />By FOG? <br />Action <br />NO <br />Required <br />No <br />Yes <br />Yes <br />Continue to <br />Monitor? <br />Issue Letter Requiring <br />Routine Lateral <br />Maintenance (3-6mos) <br />Continue to Monitor <br />No <br />Repeat CCTV <br />Impacted <br />By FOG? <br />Yes <br />Issue CW <br />Repeated Y2S <br />Revocation Letter <br />NOVs <br />equiring Grease <br />Interceptor <br />Installation <br />No <br />Continue Routine <br />FOG Inspections <br />
The URL can be used to link to this page
Your browser does not support the video tag.