My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SLS PROPERTY SOLUTIONS, INC. (6)
Clerk
>
Contracts / Agreements
>
S
>
SLS PROPERTY SOLUTIONS, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2025 11:13:41 AM
Creation date
10/16/2025 11:13:03 AM
Metadata
Fields
Template:
Contracts
Company Name
SLS PROPERTY SOLUTIONS, INC.
Contract #
A-2025-124-01
Agency
Planning & Building
Council Approval Date
8/5/2025
Expiration Date
8/4/2028
Insurance Exp Date
12/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br /> CITY OF SANTA ANA <br /> H. Door Assembly <br /> MATERIALS REQUIRED PER DOOR <br /> • 1 - 1/2" CDX PLYWOOD SHEET-CUT TO DIMENSIONS OF DOOR FRAME (WEATHER SIDE) <br /> 1 - 1/2" CDX PLYWOOD SHEET- CUT TO OUTSIDE DIMENSIONS OF DOOR FRAME TRIM <br /> (INSIDE) <br /> 6—2X4 BRACES -3 CUT TO WIDTH OF OUTSIDE PLYWOOD <br /> - 3 CUT TO WIDTH OF INSIDE PLYWOOD <br /> 1 -2X4 BOTTOM BRACE - CUT TO WIDTH OF DOOR TRIM DRILLED TO FLOOR (INSIDE) <br /> • 6-CARRIAGE BOLT ASSEMBLIES <br /> NUMBER OF DOORS TO BE SECURED (ND): <br /> NUMBER OF DOOR BRACES REQUIRED: (NE) X 6) <br /> NUMBER OF BOTTOM BRACES REQUIRED: (ND) <br /> CARRIAGE BOLT ASSEMBLIES REQUIRED (BD): (ND X 6) <br /> I. Carriage Bolt Assembly <br /> MATERIALS REQUIRED PER CARRIAGE BOLT ASSEMBLY <br /> + 1 -3/8"X 12' (OR LONGER IF NECESSARY) CARRIAGE BOLT-COURSE THREAD <br /> 1 - 1/2" USS STANDARD FLAT WASHER (WEATHER SIDE) <br /> • 1 -3/8" USS STANDARD FLAT WASHER (INSIDE) <br /> • 1 -3/8" CONSTRUCTION GRADE NUT-COURSE THREAD <br /> TOTAL CARRIAGE BOLT ASSEMBLIES REQUIRED FOR WINDOWS AND DOORS: <br /> (BW+ BD) <br /> J. Removal of Trash and Debris <br /> 1) The Contractor shall be responsible for the removal and proper disposal of all trash, debris, and <br /> waste materials generated during the demolition of any structure under this Agreement. This <br /> includes, but is not limited to, construction materials, rubble, hazardous waste, and any other by- <br /> products of the demolition process. <br /> 2) All trash and trash and debris must be removed from the site within seven (7) days following the <br /> completion of demolition activities. The Contractor shall ensure the site is left in a clean and <br /> orderly condition, free of any remaining debris. <br />
The URL can be used to link to this page
Your browser does not support the video tag.