Laserfiche WebLink
i <br /> ,t SCOPE OF WORK <br /> Contractor shall perform scope of work as set forth below and In accordance with <br /> ATTACHMENT A. <br /> A. QVNERAt_DESCRIPTION <br /> The City Is soliciting competitive bids from qualified contractors to establish multiple <br /> contracts to provide professional Electrical Contractor services on an "as-needed"basis, <br /> at various locations throughout the City of Santa Ana.per ATTACHMENT A. <br /> The initial contract shall be for a three(.3)year period with provisions for one(1)additional <br /> two-year renewal option,All prlaing shall remain firm for the Initial contract period, <br /> a. SPECIFICATIONS <br /> The City of Santa Ana intends to engage multiple qualified Contractors to supply personnel <br /> and additional. resources necessary to provide general electrical repair services <br /> throughout the City, Including computer room circuits, Installing and re-routing conduit, <br /> Installing switches and receptacles, testing, and other upgrades, Installations and <br /> replacements for City components and Infrastructure on an as-need basis. All City <br /> buildings are covered under this contract. The selected firm(s) must be available to <br /> respond to the City's request for Services twenty-four(24)hours a day,seven(7)days a <br /> week. <br /> The C.oritractor shall provide all.services in accordance with the current state adopted <br /> codes,and repair service laws or ordinances,and all rules and regulations of health,public <br /> and/or other authorities controlling or Ilmlting the methods and materials to be used,or the <br /> actions of those engages In this kind of work. <br /> C EFt0 Q t]IESCItIPT D E I NT8, <br /> 4. The Contractor shall take all necessary precautions to prevent fire hazards and <br /> spontaneous combustions, <br /> 2. The Contractor must give Immediate notice to the Facilities Maintenance Manager,or <br /> his designee, of any condition deemed hazardous to personnel and/or visitors to the <br /> City. <br /> 3. All work performed will comply In every respect with Building taws,City regulations, <br /> Code Requirements(City&State). <br /> 4. All equipment, materials, etc, specified to be removed from the site shall become <br /> property of the Contractor,unless otherwise stated. <br /> 5. All repair work and jobsitos will be left in a"broom swept"clean, safe, and workable <br /> condition, <br /> 6. In the event of accidental site damage,it will be the responsibility of the Contractor to <br /> return the site to its original condition,at no cost to the City. <br /> 7. Contractor shall keep all jobsite work areas free from aocumuiadons of waste tnaterlal <br /> or rubbish caused by Contractor employees and their work.At the end of each day at <br /> City of Santa Ana I Fki No.26-060A Page 3 of 20 <br />