My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRO-CRAFT CONSTRUCTION INC.
Clerk
>
Contracts / Agreements
>
P
>
PRO-CRAFT CONSTRUCTION INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 10:20:43 AM
Creation date
10/21/2025 10:19:58 AM
Metadata
Fields
Template:
Contracts
Company Name
PRO-CRAFT CONSTRUCTION INC.
Contract #
A-2025-166-02
Agency
Public Works
Council Approval Date
10/7/2025
Expiration Date
10/6/2028
Insurance Exp Date
5/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F SCOPE OF WORK <br /> I. SCOPE OF WORK <br /> Contractor shall perform scope of work as set forth below and in accordance with <br /> ATTACHMENT A. <br /> A. GENERAL DESCRIPTION <br /> The City is soliciting competitive bids from qualified contractors to establish multiple <br /> contracts to provide professional Plumbing Contractor services on an "as-needed" basis, <br /> at various locations throughout the City of Santa Ana. per ATTACHMENT A. <br /> The initial contract shall be for a three (3)year period with provisions for one (1)additional <br /> two-year renewal option. All pricing shall remain firm for the initial contract period. <br /> B. SPECIFICATIONS <br /> The City of Santa Ana intends to engage multiple qualified Contractors to supply <br /> personnel and additional resources necessary to provide general plumbing repair <br /> services throughout the City, including but not limited to, service installation and repair of <br /> all plumbing systems, sanitary facilities, domestic water, domestic hot water generation <br /> equipment, recirculation pumps, gas piping, commercial kitchen connections, grease <br /> traps, drain cleaning, and other work as required. The Contractor shall furnish and <br /> supply all labor, materials, supplies, equipment, and transportation necessary to perform <br /> general plumbing repair services in a scheduled and timely manner. All City buildings <br /> and facilities are covered under this agreement. The selected firm(s) must be available <br /> to respond to the City's request for Services twenty-four(24) hours a day, seven (7) <br /> days a week. <br /> The Contractor shall provide all services in accordance with the current state adopted <br /> codes, and repair service laws or ordinances, and all rules and regulations of health, <br /> public and/or other authorities controlling or limiting the methods and materials to be <br /> used, or the actions of those engages in this kind of work. <br /> GENERAL WORK DESCRIPTION AND REQUIREMENTS. <br /> 1. The Contractor shall take all necessary precautions to prevent fire hazards and <br /> spontaneous combustions. <br /> 2. The Contractor must give immediate notice to the Facilities Maintenance Manager, <br /> or his designee, of any condition deemed hazardous to personnel andlor visitors to <br /> the City. <br /> 3. All work performed will comply in every respect with Building Laws, City Regulations, <br /> Code Requirements (City& State). <br /> 4. All equipment, materials, etc. specified to he removed from the site shall become <br /> property of the Contractor, unless otherwise stated. <br /> 5. All repair work and jobsites will be left in a "broom swept" clean, safe, and workable <br /> condition. <br /> 6. In the event of accidental site damage, it will be the responsibility of the Contractor to <br /> return the site to its original condition, at no cost to the City. <br /> City of Santa Ana IFB No. 25-070A Page 3 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.