Laserfiche WebLink
(2) SCOPE OF WORK <br />7. Contractor shall keep all jobsite work areas free from accumulations of waste <br />material or rubbish caused by Contractor employees and their work. At the end of <br />each day at a site, Contractor shall remove all rubbish, debris, tools, equipment and <br />materials from a project and shall leave work area "broom clean" or equivalent <br />unless more exactly specified by the City Representative. <br />& Contractor shall comply with all hazardous materials disposal laws, rules, regulations <br />and ordinances. The contractor shall comply with all applicable Federal, State and <br />local laws and regulations and all conditions of permits controlling pollution of the <br />environment. <br />9. The contractor shall adequately secure and protect his/her own tools, equipment, <br />materials and supplies. The City shall assume no liability for any damage, theft or <br />negligent injury to the contactor's property or to the property of hislher employees, <br />agents or sub -contractors. <br />10. In submitting a bid, the Contractor, agrees all work under this contract is to be <br />performed by the Contractor's own workforce. The Contractor shall not assign or <br />subcontract any work, or any part thereof, without the expressed consent of the City <br />of Santa Ana Facilities Maintenance Manager, or his designated representative. <br />11. Contractor shall provide written, "not to exceed" estimated at no charge to the City as <br />requested. This estimate shall include the estimated number of hours, number and <br />type of employees required, estimated material costs and number of calendar days <br />required for project completion. Contractor shall respond to request for estimates <br />within two (2) working days and provide written estimates within five (5) days. It shall <br />be the contactor's responsibility to ensure they have all information to prepare <br />accurate estimates. <br />12. In the event the work performance of the contactor is unsatisfactory, the contractor <br />shall be notified and shall have seven (7) calendar days to correct the work at no <br />charge to the City. <br />C. DELIVERY REQUIREMENTS AND LOCATION(S) <br />1. Please see Exhibit II <br />D. CARB FLEET REGULATIONS: <br />The California Air Resources Board ("CARB") implemented amendments to the In -Use <br />Off -Road Diesel -Fueled Fleets Regulations ("Regulation") which are effective on January <br />1, 2024 and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or <br />greater and other forms of equipment used in California. A copy of the Regulation is <br />available at: <br />htt s://ww2.arb.ca, ov/sites/default/files/barcu/r act/2022/off-roaddiesel/a a-1. df. <br />Bidders are required to comply with all CARB and Regulation requirements, including, <br />without limitation, all applicable sections of the Regulation, as codified in Title 13 of the <br />California Code of Regulations section 2449 of seq. throughout the duration of the Project. <br />Bidders must provide, with their Bid, copies of Bidder's and all listed subcontractors' most <br />recent, valid Certificate of Reported Compliance ("CRC") issued by CARB. Failure to <br />provide valid CRCs as required herein may render the Bid non -responsive. <br />City of Santa Ana IFB No. 25-070A Page 4 of 20 <br />