Laserfiche WebLink
LSA ASSOCIATES, INC. <br />JULY 2010 <br />INITIAL STUDYIMITIGATED NEGATIVE DECLARATION <br />FIRST STREET BRIDGE REPLACEMENT PROJECT <br />CITY OF SANTA ANA <br />Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, <br />Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and <br />Housing, Public Services, Recreation, Transportation and Traffic, Utilities and Service Systems, <br />Mandatory Findings of Significance. <br />The project impact discussions identify and focus on the potential for direct and indirect significant <br />environmental effects of the proposed project. Also included is a discussion of impacts that are less <br />than significant, as well as no impacts. The discussions of mitigation measures identify and describe <br />feasible measures that could minimize or lessen each potentially significant environmental effect <br />identified in the IS and IS Checklist. <br />Sections 5.0 and 6.0: Contacts/Preparers and References <br />Sections 5.0 and 6.0, respectively, provide the organizations and persons contacted during preparation <br />of the IS/MND, preparers and technical authors, and the references used by both. <br />1.4 ANTICIPATED PROJECT APPROVALS <br />Proposed City Actions <br />The following actions are contemplated by the City to implement the proposed project. <br />1. Adoption of the IS/MND. <br />2. Adoption of a Mitigation Monitoring Program. <br />3. Consideration of Design and Construction Plans. The project includes design and construction <br />plans to replace northern structure of the bridge and southern structure of the bridge in two <br />phases. The ultimate phase would be widening of First Street to accommodate 6 travel lanes to <br />match the existing travel lanes on First Street east and west of the existing bridge. <br />4. Additional Permits and Approvals. In addition to Approvals 1 through 3 above, certain permits <br />and other approvals will be required to implement the proposed project. They may include, but <br />are not limited to, the following: ministerial permits/approvals and compliance reviews or <br />inspections, such as National Pollutant Discharge Elimination System (NPDES) Permit <br />compliance review; street work/street improvements; construction funding; approval of <br />construction plans; and South Coast Air Quality Management District (SCAQMD) Rules 402 and <br />403. In addition, permits for the jurisdictional waters of the Santa Ana River will include: federal <br />Clean Water Act Sections 404 (permit for fill from the U.S. Army Corps of Engineers) and 401 <br />(certification from the Regional Water Quality Control Board) and a Fish and Game Code Section <br />1602 Streambed Alteration Agreement (from the California Department of Fish and Game). <br />Questions regarding the preparation of this document and City review of the project should be <br />referred to the following person: <br />Mr. Jason Gabriel <br />City of Santa Ana Public Works Department <br />20 Civic Center Plaza, M-36 <br />PO Box 1988 <br />Santa Ana, CA 92702 <br />(714) 647-5664 <br />07/25/10 «PA\DMJ0701\MND\1.0 Introduction.doc» <br />1-3 <br />20A-10