My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA FIRST ST BRIDGE REPLACEMENT PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
08/16/2010
>
20A - AA FIRST ST BRIDGE REPLACEMENT PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:01:23 PM
Creation date
8/12/2010 10:13:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
20A
Date
8/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LSA ASSOCIATES, INC. INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />JULY 2010 FIRST STREET BRIDGE REPLACEMENT PROJECT <br />CITY OF SANTA ANA <br />2.0 PROJECT DESCRIPTION <br />2.1 INTRODUCTION <br />The project site is located in the City of Santa Ana (City), Orange County (County), California. The <br />proposed project will be funded in part by the federal Highway Bridge Replacement and <br />Rehabilitation (HBRR) Program. <br />The proposed project will be implemented in two phases. Demolition and construction will occur first <br />on the northern bridge structure, followed by demolition and construction of the southern bridge <br />structure. This will allow the roadway to remain operational during construction by providing one <br />through-lane in each direction. The new bridge will meet California Department of Transportation <br />(Caltrans) seismic design criteria and will add one lane in each direction and a sidewalk on the north <br />and south sides of the bridge. Currently, the bridge on First Street has 4 travel lanes, while <br />approximately 300 feet west and east of the existing bridge, First Street is a six-lane arterial. The <br />proposed project would restripe areas 300 feet east and west of the bridge structure to accommodate <br />an additional travel lane in this area. Upon project completion, First Street would be consistent with <br />the Orange County Master Plan of Arterial Highways (MPAH) and the City of Santa Ana's <br />Circulation Element which show a six-lane facility. <br />2.2 PROJECT LOCATION/SITE CONTEXT <br />The regional location of the project is in the City of Santa Ana in central Orange County, which is <br />bound on the north by the Cities of Orange and Garden Grove, on the east by the Cities of Tustin and <br />Irvine, on the south by the City of Fountain Valley, and on the west by the City of Westminster. <br />Interstate 5 (I-5) and State Route 22 (SR-22) bound the City on the north, and State Route 405 (SR- <br />405) bounds the City on the south, as shown in Figure 1. <br />The general location of the project is at the First Street/Santa Ana Bridge located on First Street, <br />between Fairview Street and Harbor Boulevard in the City of Santa Ana. The specific project limits <br />are between Susan Street on the west side and the Iglesia de Cristo church on the east side. The <br />project site is a bridge located within City right-of-way over the Santa Ana River. <br />There are three manufactured housing parks in the project vicinity; to the south-west Quiet Village, to <br />the south-east Continental Mobile Manor, to the north -east Hyde Park Mobile Estates, and to the <br />north-west residential housing. Figure 2 shows the project location in relation to surrounding land <br />uses. Figures 3 through 6 show the existing conditions and setting of the project area. Figure 7 shows <br />the design of the existing bridge. <br />P:\DMJ0701\MND\2.0 Project Description.doc (07/25/10) <br />2-1 <br />20A-12
The URL can be used to link to this page
Your browser does not support the video tag.