Laserfiche WebLink
(9)CITY OF SANTA ANA <br />Contractor shall provide City a full report of damage to City property and/or equipment by <br />Contractor's employees. All damage reports shall be submitted to the Site Coordinator within <br />twenty-four (24) hours of occurrence. <br />Contractor shall provide, erect, and maintain all warning devices (i.e., barricades, cones, etc.) <br />as required or necessary to ensure the safety of the public, City, and Contractor's employees. <br />SPILL LIABILITY <br />The City does not assume liability for spills or other releases of hazardous wastes which are <br />caused by the negligence of the contractor once hazardous waste materials are in the <br />possession of the contractor or transported off site. <br />K. RECORDKEEPING AND REPORTS <br />Contractor is required to provide upon request, detailed data and information required by the <br />City. Information may include: generator EPA ID, contractor EPA ID, generator name, waste <br />description, manifest number and line number, date waste shipped, disposal and recycling <br />facilities utilized, final disposal method utilized, quantity shipped (pounds), waste profile <br />number, and any additional information requested. <br />All records and reports shall be available in electronic (including Excel, Word, and PDF <br />Format) and hard copy format at all times during the term of the contract. <br />XV. AWARD OF AGREEMENT <br />Selected Contractor(s) will be notified in writing. Any award is contingent upon the successful <br />negotiation of final contract terms. <br />A. EXECUTION OF AGREEMENT <br />A standard agreement is included as EXHIBIT II Sample Agreement of this RFP. "Proposer" <br />will hereinafter be referred to as "Consultant" or "Contractor" in standard agreement. The <br />term of the agreement will begin after the agreement is fully executed, and all required bonds, <br />insurance documents and contents of the payment information packet have been received <br />and approved. <br />XVI. IMPLEMENTATION <br />A. KICK-OFF MEETINGS <br />The successful Proposer will be required to meet with City staff prior to commencement of <br />services or at any time as required by the City, to discuss and agree on operational issues <br />including transition of services and scheduling. <br />City of Santa Ana RFP 25-116 Page 19 of 60 <br />