Laserfiche WebLink
(9)CITY OF SANTA ANA <br />10. Daily work/routes and schedules will be assigned by City Staff. <br />11. Contractor shall furnish all labor, equipment tools, and materials and supplies including <br />Personal Protective Equipment (PPE), such as face mask respirator (N- 95), gloves, <br />coverall suits, trash bags and the skills and training required to perform all services listed <br />above. <br />12. Contractor shall furnish all Signs used for handling traffic control during the course of <br />this contracts and shall be in accordance with the "Work Area Traffic Control Handbook" <br />(WATCH), published by Building News, Inc., and made a part of these special <br />provisions. The method in which signs, barriers, and warning devices are used during <br />the work shall be in accordance with the publication mentioned. A copy of said <br />publication is on file in the Public Works Agency. <br />2. TRANSIENT AND HOMELESS ENCAMPMENT CLEAN-UP <br />1. Contractor shall remove abandoned transient/homeless encampments that may <br />include, but not be limited to tents, soiled clothing, blankets, human feces, hypodermic <br />needles, and items listed above. <br />2. Contractor shall remove unwanted natural or environmental materials including, <br />but not limited to, bio-waste, dirt, nests, hypodermic needles, silt, feces, grime <br />and similar. <br />3. Contractor may be assigned to work alongside Local Law Enforcement (Santa <br />Ana Police Department and California Highway Patrol). <br />4. Contractor shall be required to report transient occupied Homeless <br />Encampments on City and Caltrans properties to Project Manager. <br />3. AS -NEEDED WEED AND DEBRIS REMOVAL AND LOT CLEANING — CREW LABORER <br />1. Additional as -needed crew laborer services may be requested by the City <br />and will be compensated at the regular hourly rate as per appropriate bid line <br />item pricing. <br />2. City will issue a work order request for such work to be performed. <br />3. These services include, but are not limited to the services listed in Section I. <br />WORK ORDERS, ASSIGNMENTS, AND SCHEDULE <br />Work shall be assigned by the City Projects Manager (or Inspector or other City Designated <br />Person) and shall be on an As -Needed or on a Set Schedule basis, subject to budget <br />appropriation availability and changes bythe Projects Manager. Work hours and staffing may <br />be increased or decreased based on funding availability. The Projects Manager will work with <br />the Contractor to prepare the most effective and productive schedules and work <br />assignments. <br />Crew Unit Size(s) will vary based on task and assignment and as determined between Projects <br />Manager and Contractor. Work assignments may vary and may consist of performing weed <br />City of Santa Ana RFP 25-116 Page 21 of 60 <br />