My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 18 - Construction Contract for Traffic Signal Improvements Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 2:03:48 PM
Creation date
10/29/2025 1:29:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Segerstrom Ave/Raitt St and <br />Segerstrom Ave/Flower St Traffic <br />Signal Modifications <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Safety / Mobility <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Design and installation of left turn arrows at Segerstrom <br />Avenue/Raitt Street and Segerstrom Avenue/Flower Street <br />IPROJECT NEED: <br />Project is needed to enhance traffic safety and increase mobility. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 975,000 - - - - - - <br />Contingency 130,000 <br />Engineering 195,000 <br />TOTAL 1,300,000 - - - - - <br />SOURCE OF FUNDS FY 24125 FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 FY 30131 <br />GENERAL FUND 1,300,000 - - - - - - <br />TOTAL 1,300,000 - - - - <br />DIVISION: <br />Traffic Engineering <br />CONTACT: <br />Cesar Rodriguez, Senior Civil Engineer <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.