My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Resolution to Carry Over Existing Funds to the 2027 FTIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
11/04/2025
>
Item 19 - Resolution to Carry Over Existing Funds to the 2027 FTIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 1:52:09 PM
Creation date
10/29/2025 1:31:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
11/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />2027 FTIP CARRY OVER PROJECT LISTING <br />CITY <br />PROJECT <br />NO. <br />COUNCIL <br />ACTION <br />DATE <br />OCTA <br />PROJECT <br />ID <br />CARRY-OVER <br />PROJECTS <br />GRANT <br />FUNDING <br />TYPE <br />GRANT <br />AMOUNT <br />AWARDED <br />AMOUNT <br />SPENT TO <br />DATE <br />PROJECT <br />STATUS <br /> <br />19-6951 12/20/2022 ORA170804 <br />City of Santa Ana-SRTS <br />Davis Elementary ADA <br />Compliance <br />ATP $4,834,000 $4,821,738 Construction <br />18-6912 CIP 17/18 ORA152213 Citywide Bike Racks CMAQ $162,800 $155,905 Design <br />11-6741 4/21/2020 ORA150003 <br />Bristol Street <br />Improvements: Warner <br />Avenue to St. Andrew <br />Place <br />DEMO $2,062,000 $0 Construction <br />15-6827 11/21/2023 ORA170007 <br />Fairview Bridge (Bridge <br />#55C0513) and Street <br />Improvements <br />HBRR $18,692,000 $0 Construction <br />13-6792 4/21/2020 ORA150004 <br />Bristol Street <br />Improvements: Civic <br />Center Drive to <br />Washington Avenue <br />DEMO $1,075,000 $0 Construction <br />20-6964 7/18/2023 ORA190901 <br />Fremont Elementary and <br />Spurgeon Intermediate <br />SRTS <br />ATP $4,849,000 $4,825,232 Construction <br />20-6962 9/23/2024 ORA190904 <br />McFadden Avenue <br />Protected Bike Lane and <br />Bicycle Boulevard Project <br />ATP $5,875,000 $1,643,439 Construction <br />20-6965 9/23/2024 ORA190905 <br />Standard Avenue <br />Protected Bike Lane and <br />Protected Intersection <br />Project <br />ATP $5,444,000 $5,335,180 Construction <br />20-6971 3/16/2021 ORA190919 Warner Avenue Protected <br />Bike Lanes CMAQ $94,010 $93,840 Design <br />23-6998 CIP 22/23 ORA210901 Raitt Street Protected and <br />Buffered Bike Lane Project ATP $889,000 $793,376 Design <br /> <br />24-6709 CIP 24/25 ORA230802 <br />Orange Avenue Bike Lane <br />and Bicycle Boulevard <br />Project <br />ATP $851,000 $69,316 Design <br />23-6037 6/6/2023 ORA232001 Memory Lane and Flower <br />Street Bikeway ATP $450,000 $228,006 Design <br />11-6741 CIP 24/25 ORA190915 <br />Bristol Street Protected <br />Bike Lanes: Phase II <br />Warner Avenue to St. <br />Andrew Place <br />CMAQ $1,508,000 $0 Design <br /> <br />11-6741 CIP 24/25 ORA190916 <br />Bristol Street Protected <br />Bike Lanes: St. Andrew <br />Place to Edinger Avenue <br />CMAQ $88,000 $0 Design <br />TBD CIP 24/25 ORA190917 <br />Bristol Street Protected <br />Bike Lanes: Civic Center <br />Drive to Washington <br />Avenue <br />CMAQ $794,000 $0 Construction <br /> <br />24-6916 CIP 24/25 ORA190918 <br />Bristol Street Protected <br />Bike Lanes: First Street to <br />Civic Center Drive <br />CMAQ $125,000 $58,047 Design
The URL can be used to link to this page
Your browser does not support the video tag.