My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - SR55/MACARTHUR BLVD RAMP WIDENING (2)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
08/16/2010
>
23B - SR55/MACARTHUR BLVD RAMP WIDENING (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:01:24 PM
Creation date
8/12/2010 2:12:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23B
Date
8/16/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />AUGUST 2, 2010 <br />TITLE: <br />CONTRACT AWARD FOR SR55/ <br />MACARTHUR BOULEVARD RAMPS <br />WIDENING (PROJECT NO. 072503) <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />? As Recommended <br />? As Amended <br />? Ordinance on 15` Reading <br />? Ordinance on 2nd Reading <br />? Implementing Resolution <br />? Set Public Hearing For <br />CONTINUED TO A(? 1 6 2070 <br />FILE NUMBER <br />1. Award a contract to Peterson-Chase General Engineering Construction, Inc., the lowest <br />responsible bidder, in accordance with unit bid prices in the estimated amount of <br />$1,126,850.64 for construction of SR-55/MacArthur Boulevard Ramps Widening. <br />2. Approve a Funding Analysis with a total estimated construction cost of $1,577,000. <br />3. Direct the City Manager and Clerk of the Council to execute the attached Construction <br />Cooperative Agreement with Caltrans for the State Route 55/MacArthur Boulevard Ramps <br />Widening project. <br />DISCUSSION <br />This project includes widening eastbound MacArthur Boulevard from three to four lanes between <br />Hutton Centre Drive and the northbound State Route 55 on-ramp, and widening the southbound <br />and northbound State Route 55 on-ramps from one to two metered lanes (Exhibit 1). This is a <br />traffic mitigation measure for the MacArthur Place South development. The proposed <br />improvements to the ramps and roadway are necessary to provide additional capacity for the <br />increased traffic volume anticipated in project build-out year 2035. Once completed, these <br />improvements will improve traffic flow on MacArthur Boulevard. <br />Since this project includes work within Caltrans right-of-way, a construction cooperative agreement <br />between the City and Caltrans is required. <br />23B-1
The URL can be used to link to this page
Your browser does not support the video tag.