Laserfiche WebLink
12-ORA-55-6.8-6.9 <br />EA: OH290 <br />District Agreement 12-0624 <br />SCOPE SUMMARY <br /> <br /> <br />a <br /> <br />? <br /> <br />so <br /> <br />i• <br /> <br />oo CO <br /> <br />Q' <br /> <br />o cn <br />zQ <br />oC <br /> <br />v <br />c <br />a <br />w <br /> <br />rn <br /> <br />i <br />5 270 Construction Engineering and General Contract <br />Administration X X <br /> 10 Construction staking Package and Control X <br /> 15 Construction Stakes X <br /> 20 Construction Engineering Work X <br /> 25 Construction Contract Administration Work X <br /> 30 Contract Item Work Inspection X <br /> 35 Construction Material Sampling and Testing X X <br /> 05 Materials Sampling and Testing for Quality Assurance X <br /> 10 Plant Inspection for Quality Assurance X <br /> 15 Independent Assurance Sampling and Testing X <br /> 20 Source Inspection X <br /> 40 Safety and Maintenance Reviews X <br /> 45 Relief From Maintenance Process X <br /> 55 Final Inspection and Acceptance Recommendation X <br /> 60 Plant Establishment Administration X <br /> 65 Transportation Management Plan Implementation During <br />Construction X <br /> 75 Resource Agency Permit Renewal and Extension <br />Requests X <br /> 80 Long-Term Environmental Mitigation/Mitigation <br />Monitoring During Construction Contract X <br /> 99 Other Construction Engineering and General Contract <br />Administration X <br />5 285 Contract Change Order Administration X <br />5 290 Resolve Contract Claims X <br />5 295 Accept Contract, Prepare Final Construction Estimate, <br />and Final Report X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PACT Version 9.1 3.31.08 <br />16 of 17 <br />23B-21