My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KTUA (KTU&A, LLC)
Clerk
>
Contracts / Agreements
>
K
>
KTUA (KTU&A, LLC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 1:47:10 PM
Creation date
11/25/2025 1:46:30 PM
Metadata
Fields
Template:
Contracts
Company Name
KTUA (KTU&A, LLC)
Contract #
A-2025-188
Agency
Public Works
Council Approval Date
11/4/2025
Expiration Date
11/3/2026
Insurance Exp Date
9/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED WORK PLAN/UNDERSTAKDINGOF NEED <br /> TASK 7:DEVELOP SAFETY STRATEGIES TASK 9:DEVELOP COST ESTiMATES <br /> 7.1 develop Safety Strategies 9.1 Cost Estimates <br /> Based on the collisions identified,roadway design,road- Based on the corridor Conceptual Engineering Plans devel- <br /> way conditions,and other trends identified from the oped,quantities will be generated,and unit pricing applied <br /> crash analysis,KTUA,with support from Mark Thomas to prepare a conceptual level cost estimate using the ATP <br /> will develop tailored safety strategies and interventions Cost Estimate format(Attachment F).Unit costs will be deter- <br /> (countermeasures)for each of the five selected corridors_ mined based on the following: <br /> Santa Ana Vision Zero exhibits and drawings/plans will Review of local City examples <br /> incorporate the new corridorslstreel.segments and align Review of Mark Thomas projects for City and other <br /> with current best practices in traffic safety. The team will agencies <br /> review published research and the latest trends to identify • 'Collaboration with City staff <br /> potential countermeasures with the greatest potential to The cost estimates will be prepared for each of the;even <br /> address collision types.The Highway Safety Manual(HSM) (7)street segments.Project cost estimates will be reviewed <br /> and Crash Modification Factors(CMF)Clearinghouse will <br /> with City staff to verify estimated cost by project phase to <br /> be utilized heavily for this task_CMF factors will be used <br /> to estimate the expected number of collisions after imple- <br /> mentinga given countermeasure at a speck intersection TASK 9 DELIVERABLES: <br /> or MPAH corridor(the lower the CMF,the greater the ^ Cost estimates for each of the seven(7)new corridor/ <br /> expected reduction in collisions). street segments <br /> KTUA will use an innovative approach such as complete TASK 10:DRAFT AND FINAL V'iSION ZERO PLAN UPDATE <br /> street,design,traffic calming measures,improved signage, <br /> enhanced crosswalks,and protected hike lanes-Strategies 10.1 Draft lfision Zefo Plan Update <br /> may include but are not limited to. KTUA will update the Santa Ana Vision Zero into a Draft <br /> Implementation of traffic calming measures(speed Update to include the new conrdors/segments.As needed, <br /> humps/cushions,new or mod.traffic signals,etc.) the other maps,tables,exhibits,appendices,etc.related <br /> Enhanced crosswalks and pedestrian signals to the addition of the seven(7)new corridors,plans/recom- <br /> • Dedicated bike lanes or shared-use paths mendations,and any relevant information,will be updated.. <br /> • Improved street lighting and signage The community engagement section will also be updated to <br /> Implementation of landscaped concrete medium, include summaries of the six(6)total workshops conducted <br /> in each of the City s six(6)wards.This plan will be provided <br /> TASK 7 DELIVERABLES: for City review for two rounds of revisions. <br /> - List/table outlining safety strategies and interventions <br /> (countermeasures) 10.2 Final vision Zero Plan Update <br /> Upon completion of the City's review.comments will be <br /> TASK 8:IMPLEMENTATION PLAN! addressed but KTUA_KTUA will develop a Final Updated Vi- <br /> sion Zero Action Plan to include all components mentioned <br /> 8.1 Develop Implementation Plan above in the Scope of Work.This plan will be provided to <br /> The KTUA team will create an updated implementation the City for two rounds of revisions.Ten 00)hard copies of <br /> plan outlining the fimeline,responsibilities,and budget for the final plan will be printed and delivered as well as one(1) <br /> each safety strategies and interventions(countermeasure). single electronic copy will be delivered electronically_ <br /> Coordination will be conducted with relevant City depart- TASK 10 DELIVERABLES: <br /> ment,and agencies to ensure alignment with broader ^ Draft Updated Vision Zero Action Plan <br /> transportation and urban planning initiatives. • Final Updated Vision Zero Action Plan <br /> TASK 8 DELIVERABLES; - Ten(10)Printed copies of the Final Vision Zefo Action Plan <br /> * Implementation plan of safety strategies and interven- Update <br /> dons(countermeasures)of the seven(7)new corridor/ • One 0 Electronic copy of the Final Vision Zero Action Plan <br /> street segments Update <br /> SANTA ANA VISION ZERO PLAY UPDATE 1 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.