Laserfiche WebLink
City of Santa Ana <br />California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Implementation <br />Implementation <br />Monitored <br />Outside <br />Mitigation Measure <br />Party <br />Phase <br />By <br />Agency <br />Coordination <br />Pursuant to Rule 403 of the South Coast Air Quality <br />Management District (SCAQMD), the following dust <br />minimizing measures shall be implemented: <br />➢ City of Santa Ana and its designees shall <br />comply with all applicable SCAQMD Rules and <br />Regulations, including Rule 403 ensuring the <br />cleanup of construction -related dirt on <br />approach routes to the site. Rule 403 prohibits <br />the release of fugitive dust emissions from any <br />active operation, open storage pile or disturbed <br />surface area visible beyond the property line of <br />the emission source. <br />AIR-1 <br />➢ City of Santa Ana and its designees shall <br />City of Santa Ana <br />�' <br />Construction <br />City of Santa <br />Ana <br />N/A <br />comply with all SCAQMD established minimum <br />requirements for construction activities to <br />reduce fugitive dust and PMio emissions. <br />➢ Adequate water techniques shall be employed <br />to mitigate the impact of construction -related <br />dust particulates. Portions of the site that are <br />undergoing surface earth moving operations <br />shall be dewatered such that a crust will be <br />formed on the ground surface, and then <br />watered again at the end of each day. Site <br />watering shall be performed as necessary to <br />mitigate blowing dust. <br />