My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 24-6604 <br />SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Armstrong Cal Builders Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />$5,000 <br />2 <br />Potholing (As -Needed) * <br />5 <br />EA <br />S <br />$ <br />$3,000.00 <br />$15,000.00 <br />3 <br />Clearing and Grubbing <br />I <br />LS <br />S <br />$675,000.00 <br />$675,000.00 <br />4 <br />Unclassified Excavation and Export <br />640 <br />CY <br />$ <br />$450.00 <br />$288,000.00 <br />5 <br />Removal of Existing Utilities <br />1 <br />LS <br />$ <br />$ <br />$35,000.00 <br />$35,000.00 <br />6 <br />Cold Milling (2" Max) <br />9,100 <br />SF <br />$ <br />$ <br />$1.50 <br />$13,650.00 <br />7 <br />Asphalt Concrete (HMA) <br />825 <br />TON <br />$ <br />$ <br />$210.00 <br />$173,250.00 <br />8 <br />Crack Repair and Emulsion Aggregate <br />15,000 <br />SF <br />$ <br />$ <br />Slurry <br />$3.00 <br />$45,000.00 <br />9 <br />PCC Sidewalk per C.S.A. Std. 1104 <br />4,500 <br />SF <br />$ <br />$13.00 <br />$58,500.00 <br />10 <br />PCC Sidewalk per City of Tustin Std, <br />2,900 <br />SF <br />$ <br />$ <br />202 <br />$13.00 <br />$36,400.00 <br />11 <br />Decorative PCC Sidewalk <br />2,700 <br />SF <br />$ <br />$19.00 <br />$51,300.00 <br />12 <br />8" PCC Pavement <br />275 <br />SF <br />$ $32.00 <br />$ $8,800.00 <br />13 <br />7" PCC Commercial Driveway Apron <br />620 <br />SF <br />and Depressed Curb per City of Tustin <br />$27.00 <br />$16,740.00 <br />Std. 208 <br />P-1 of P-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.