My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Implementation <br />Implementation <br />Monitored <br />Outside <br />Mitigation Measure <br />Party <br />Phase <br />By <br />Agency <br />Coordination <br />■ Break line of sight from noise source to <br />receiver <br />■ Use a frame to secure an appropriate <br />acoustic blanket or paneling <br />• Use a solid material with a minimum <br />surface density of 3 Ib/ft2 or mass -loaded <br />acoustic blankets with at least STC 25 <br />■ Overlap or seal any gaps in the barriers <br />➢ Designate haul routes to be used based on the <br />least overall noise impact route, with heavily - <br />loaded trucks away from residential streets, if <br />possible. Identify haul routes streets with the <br />fewest noise sensitive receivers if no <br />alternatives are available. <br />➢ Place earth -moving equipment, fixed noise - <br />generating equipment, stockpiles, staging <br />areas, and other noise -producing operations as <br />far as practicable from noise -sensitive <br />receivers. <br />➢ Eliminate the use of horns, whistles, alarms, <br />and bells. <br />➢ Phase demolition, earth moving, and ground <br />impacting operations so they do not occur in <br />the same time period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.