My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />California Environmental Quality Act <br />Mitigation Monitoring and Reporting Plan <br />Santa Ana Zoo Stormwater Capture and Diversion MND <br />Mitigation Monitoring and Reporting <br />Implementation <br />Implementation <br />Monitored <br />Outside <br />Mitigation Measure <br />Party <br />Phase <br />By <br />Agency <br />Coordination <br />homeowners, and other residents adjacent to and <br />within areas potentially affected by the proposed <br />Project about the nature, extent, and duration of <br />construction activities. Interim updates should be <br />provided to inform the public of the status of the <br />construction activities. <br />The Contractor will notify local Police and Fire <br />Departments of its intent for a full street closure at <br />City of Santa <br />TRAF-1 <br />least two (2) days before closure is to begin. The <br />City of Santa Ana <br />Construction <br />Ana <br />N/A <br />Contractor shall cooperate with local authorities relative <br />to handling traffic through the area. <br />Transportation of heavy construction equipment and/or <br />materials which requires use of oversized -transport <br />vehicles on State highways will need a Caltrans <br />transportation permit. The Project specifications will <br />City of Santa <br />California <br />TRAF-2 <br />limit construction traffic to off-peak periods to minimize <br />City of Santa Ana <br />Construction <br />Ana <br />Department of <br />the potential impact on State facilities. If construction <br />Transportation <br />traffic is expected to cause delays on any State <br />facilities, a construction traffic control plan detailing <br />these delays shall be submitted for Caltrans' review. <br />Retain a Native American Monitor 30 Days Prior to <br />Commencement of Ground -Disturbing Activities <br />Native <br />TCR-1 <br />➢ The Project applicant/lead agency shall retain a <br />City of Santa Ana <br />Construction <br />City of Santa <br />American <br />Native American Monitor(s). The monitor(s) shall <br />Ana <br />Heritage <br />be retained prior to the commencement of any <br />Commission <br />"ground -disturbing activity" for the subject <br />Project at all Project locations (i.e., both on -site <br />
The URL can be used to link to this page
Your browser does not support the video tag.