Laserfiche WebLink
CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE: <br />� PROJECT DESCRIPTION: <br />Santa Ana Zoo Stormwater Capture and <br />The project features the installation of subsurface stormwater infiltration <br />Diversion Project <br />systems at the Santa Ana Zoo to capture and infiltrate approximately 67 <br />acre-feet per year of stormwater and dry -weather runoff. The project will <br />also include a new urban green space, bioswales, pervious pavement, <br />PROJECT CATEGORY: <br />seating, drought -tolerant landscaping and shade trees, and interpretive <br />' <br />Utility/Drainage/Lighting Improvements signage <br />Park Facility <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />PROJECT NEED: <br />Stormwater infiltration provides multiple benefits, including improving water <br />quality, enhancing local water supplies, and reducing flooding. The project will <br />also feature a new urban green space in the zoo parking lot, which will <br />provide recreational benefits to the surrounding community. <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 3,700,000 - - - - - <br />TOTAL 3,700,000 - - - - - <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Caltrans Cooperative 3,700,000 - - - - - <br />Implementation Agreement <br />TOTAL 3,700,000 - - - - - <br />DIVISION: <br />Construction Engineering <br />CONTACT: <br />Craig Foster, NPDES Manager <br />FY 31/32 <br />FY 31/32 <br />DATE: <br />04-Nov-2025 <br />