My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />California Environmental Quality Act <br />Initial Study/Mitigated Negative Declaration <br />➢ Grading operations shall be suspended during first stage ozone episodes or when winds exceed <br />25 mph. A high wind response plan shall be formulated for enhanced dust control if winds are <br />forecast to exceed 25 mph in any upcoming 24-hour period. <br />➢ Any construction equipment using direct internal combustion engines shall use a diesel fuel with <br />a maximum of 0.05 percent sulfur and four -degree retard. <br />➢ Construction operations affecting roadways within the Project area including detour routes, shall <br />be scheduled by implementing traffic hours and shall minimize obstruction of through traffic <br />lanes. <br />➢ The engines of idling trucks or heavy equipment shall be turned off if the expected duration of <br />idling exceeds five minutes. <br />➢ On -site heavy equipment used during grading and construction shall be equipped with diesel <br />particulate filters unless it is demonstrated that such equipment is not available, or its use is not <br />cost -competitive. <br />➢ All haul trucks leaving or entering the site shall be covered or have at least two feet of freeboard. <br />➢ Any on -site stockpiles of debris, dirt or other dusty material shall be covered or watered twice <br />daily. <br />➢ Any site access points within 30 minutes of any visible dirt deposition on any public right of way <br />shall be mechanically or manually swept. <br />-13CWE7 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.