My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />3.10 Hydrology and Water Quality <br />Would the project: <br />California Environmental Quality Act <br />Initial Study/Mitigated Negative Declaration <br />Less Than <br />Potentially <br />Significant <br />Less Than <br />No <br />Environmental Issue <br />Significant <br />with <br />Significant <br />Impact <br />Impact <br />Mitigation <br />Impact <br />Incorporated <br />a) Violate any water quality standards or waste <br />discharge requirements or otherwise substantially <br />X <br />degrade surface or ground water quality? <br />b) Substantially decrease groundwater supplies or <br />interfere substantially with groundwater recharge <br />such that the project may impede sustainable <br />X <br />groundwater management of the basin? <br />c) Substantially alter the existing drainage pattern <br />of the site or area, including through the alteration <br />of the course of a stream or river or through the <br />addition of impervious surfaces, in a manner which <br />would: <br />i) result in substantial erosion or siltation on- or off - <br />site; <br />X <br />ii) substantially increase the rate or amount of <br />surface runoff in a manner which would result in <br />X <br />flooding on- or offsite; <br />iii) create or contribute runoff water which would <br />exceed the capacity of existing or planned <br />stormwater drainage systems or provide substantial <br />X <br />additional sources of polluted runoff; or <br />iv) impede or redirect flood flows? <br />X <br />d) In flood hazard, tsunami, or seiche zones, risk <br />release of pollutants due to project inundation? <br />X <br />e) Conflict with or obstruct implementation of a <br />water quality control plan or sustainable <br />X <br />groundwater management plan? <br />Discussion: <br />a) The proposed Project is not expected to significantly violate water quality standards, waste discharge <br />requirements, or surface and groundwater quality. Construction activities will comply with <br />regulations set forth by the Federal Clean Water Act, the Santa Ana Regional Water Quality Control <br />Board (SARWQCB), Orange County, the City of Santa Ana, and other relevant water quality control <br />
The URL can be used to link to this page
Your browser does not support the video tag.