My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 15 - Award Construction Contract for the Santa Ana Zoo Stormwater Capture and Diversion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 11:00:08 AM
Creation date
11/26/2025 8:25:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />California Environmental Quality Act <br />Initial Study/Mitigated Negative Declaration <br />west at 1441 E. Chestnut Avenue, Santa Ana, CA 92701), Robert Heideman Elementary <br />School (0.4 miles south at 15571 Williams Street, Tustin, CA 92780), and Reach Academy <br />(0.7 miles northwest at 1325 E. 4t" Street, Santa Ana, CA 92701). The Project is not <br />anticipated to impact operations or increase student population. While the Project will <br />temporarily affect normal traffic levels during construction, the impacts are expected to be <br />less than significant. <br />iv. The proposed Project will enhance open space areas. The addition of the pocket park will <br />include passive recreation improvements, such as a bioswale system, signage, landscaping, <br />pathways, and lighting. This will benefit the community and align with the goals outlined in <br />the City's General Plan. As a result, the number of recreational users at other parks may <br />fluctuate. Consequently, impacts are expected to be less than significant. <br />V. Other services, such as City Hall, public libraries, and municipal services, are located outside <br />of the Project area. Although City staff will be required to maintain park operations, impacts <br />on service ratios are not expected to be significant. Therefore, impacts are expected to be <br />less than significant. <br />Mitigation Measure: <br />PS-1— The City shall provide reasonable advance notification to service providers such as fire, police, <br />and emergency medical services as well as to local businesses, homeowners, and other residents <br />adjacent to and within areas potentially affected by the proposed Project about the nature, extent, and <br />duration of construction activities. Interim updates should be provided to inform the public of the status <br />of the construction activities. <br />-40CWE7 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.