Laserfiche WebLink
Docusign Envelope ID: EFBAE12B-2D33-4288-BDF3-3F19BEEB5A9F <br />CITY OF SANTA ANA <br />B. Any parts other than those manufactured by the original equipment manufacturer shall be approved <br />by the Project Manager or designee before they are utilized. <br />C. Contractor shall maintain sufficient off-the-shelf parts/materials on hand to support City's Service <br />requirements. Lack of availability of parts/materials shall not relieve the Contractor from completing <br />Service within agreed to timeframe specified in the agreement(s) issued by City. <br />Xlll. PERSONNEL <br />A. Contractor's personnel responsible for providing Services under this Contractor shall be specifically <br />trained and qualified to perform all Services according to manufacturer's instructions. Evidence of <br />all qualifications of personnel, including a minimum of five (5) years of experience in their respective <br />trade shall be provided to the Project Manager or designee as requested. <br />B. Contractor is responsible for providing sufficient personnel to accomplish all Services as indicated <br />in Agreement(s) awarded by City. <br />C. All Contractor employees shall be identified by a distinctive company logo, emblem, or patch <br />attached in a prominent place on an outer garment and be easily recognizable as Contractor for <br />Video Surveillance Maintenance and Repair Services. Employee identification shall not be <br />substituted for required City badges or passes (if applicable). <br />XIV. SAFETY REQUIREMENTS <br />A. Contractor shall take all reasonable precautions, as directed by the County, or in the absence of <br />such direction, in accordance with sound industrial practices, to safeguard and protect City property <br />and adjacent property. Damages to properties caused by Contractor's negligence shall be repaired <br />at no cost (both labor and material) to the City. <br />B. Contractor shall keep work areas clean and free from any debris, rubbish, hazardous waste and <br />non-usable material resulting from the work under this Contract and shall be disposed of at the <br />completion of each work day by the Contractor at its cost. Hazardous waste must be disposed of in <br />accordance with all applicable technical bulletins, trade, federal, state, and local laws and <br />regulations. <br />C. Contractor is responsible for advising and ensuring compliance by Contractor's employees with all <br />applicable environmental and hazardous materials handling laws and regulations. <br />D. Contractor and its employees must have and maintain Material Safety Data Sheets (MSDS) on all <br />materials that are so required by state and federal laws and/or regulations <br />E. Contractor shall provide City a full report of damage to City property and/or equipment by <br />Contractor's employees. All damage reports shall be submitted to the Project Manager within twenty- <br />four (24) hours of occurrence. <br />F. During and at completion of work, debris shall not be allowed to spread unnecessarily into adjacent <br />areas nor accumulate in the work area. All debris, excess material, and parts, including those <br />materials that could inflict injury (e.g., nails, wire, wood, etc.), shall be cleaned up continuously as <br />work progresses and removed at the completion of the job and/or at the end of each work day. <br />XV. SECURITY REQUIREMENTS <br />The City operates secured facilities. Contractors and their employees who perform Services at secured <br />facilities will be required to adhere to strict operation policies designed with the primary purpose of <br />ensuring a safe and secure environment. <br />A. Contractor must provide a list of all personnel/employees who will be directly performing tasks <br />associated with the Contract. Contractor's personnel/employees providing Service in a secured <br />detention facility, or a Police Department facility, will be expected to pass two (2) separate <br />background checks performed by Contractor as appropriate at its cost and the City of Santa Ana <br />RFP 25-1 09A City of Santa Ana Page 26 of 51