My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Agreements for Video Surveillance System Upgrade and Maintenance and Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 30 - Agreements for Video Surveillance System Upgrade and Maintenance and Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 9:08:08 AM
Creation date
11/26/2025 8:45:25 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
30
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK and COSTS PROPOSAL <br />1. Convergint to provide an initial assessment in collaboration between the City and <br />Convergint. The assessment is expected to take up to twelve (12) weeks with a total of 480 <br />engineering hours. Any additional hours required will be subject to an approved change <br />order. <br />2. The City shall provide the following to support the assessment <br />* Building plans/backgrounds in CAD or PDF format. <br />* Site access to all locations related to this SOW without any delays <br />* Administrative access (username/password) to the existing surveillance equipment <br />including the servers and cameras. <br />3. For the PAAL Center, Convergint shall install (10) new cameras and (1) new Milestone <br />recorder for PAAL Center. Convergint assumes: <br />* Convergint shall provide all wiring and terminations work. <br />* All pathways such as but not limited to conduit and trenching will be provided by others. <br />* All network infrastructure to be provided by others <br />* 120 VAC power to be provided by others <br />* No lifts are included. All camera work is assumed to be below 12 feet and accessible via <br />ladder. <br />4. The work for the City's libraries shall exclude <br />* any design, drawings and project documentation work <br />* any field cameras installation, field cameras work, field cameras adjustment and <br />modification work <br />* any project weekly/coordination meetings <br />5. For the Centennial Park Regional Training Facility - the new (5) cameras will be connected <br />to VSS-Centennial for consistency and cost efficiency. Convergint assumes: <br />* Convergint shall provide all wiring and terminations work. <br />* All pathways such as but not limited to conduit and trenching will be provided by others. <br />* All network infrastructure to be provided by others <br />* 120 VAC power to be provided by others <br />@ No lifts are included. All camera work is assumed to be below 12 feet and accessible via <br />ladder. <br />6. Convergint shall include in the proposal to increase the existing City's Milestone SLC below <br />with additional 177 licenses with Milestone Care Plus service agreement expiring on <br />5/31/2026. The final total licenses will be 825 per RFP requirements. Any Milestone service <br />agreements cost beyond 6/1/2026 will be provided separately via an approved change <br />order/proposal. <br />* Per RFP Santa Ana Police Department, the current Milestone license SLC#1 MO1-CO1- <br />203-01-6C4B79 has a total of 648 licenses. <br />* Per the RFP, the City's existing vendor will be upgrading existing Milestone to 2025 R2 <br />by end of September 2025. Thus, this proposal did not include any Milestone system <br />upgrade work. <br />convergjnt l1Page
The URL can be used to link to this page
Your browser does not support the video tag.