My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Annual Development Impact Fee Report for Fiscal Year 2024-2025
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 12 - Annual Development Impact Fee Report for Fiscal Year 2024-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 9:58:55 AM
Creation date
11/26/2025 9:58:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the “Park Acquisition and Development Fund,” which will be used for the acquisition, construction and <br />renovation of park and recreation facilities. <br />Transit Zoning Code Fees <br />The transit zoning code fees provide a transit-supportive, pedestrian-oriented development framework to <br />reduce vehicle trips, reduce greenhouse gas emissions, and support the addition of new transit infrastructure. <br />Harbor Specific Plan Fees <br />The Harbor Specific Plan fees support improvements made to increase safety along Harbor Boulevard. <br />List the amount of the fee. <br />Drainage Assessment Fee Schedule <br />Areas Effective 7/1/2024 <br />Area 1 $ 8,715.00 <br />Area 2 $ 10,506.00 <br />Area 3 $ 5,656.00 <br />Area 4 $ 8,348.00 <br />Area 5 $ 9,511.00 <br />Area 6 $ 9,353.00 <br />Sewer Connection Fee Schedule: $53.00 per plumbing fixture unit. <br />Water Capacity Fee Schedule <br />Meters Effective 7/1/2024 <br />5/8” Meter $ 930.00 <br />3/4” Meter $ 1,395.00 <br />1” Meter $ 2,325.00 <br />1 1/2” Meter $ 4,650.00 <br />2” Meter $ 7,440.00 <br />3” Meter $ 16,275.00 <br />4” Meter $ 30,496.00 <br />6” Meter $ 62,928.00 <br />Transportation System Improvement Area Fee Schedule <br />Non-Residential Areas Effective 7/1/2024 <br />Area A $ 5.15 / sq. ft. <br />Area B $ 1.81 / sq. ft. <br />Area C $ 5.53 / sq. ft. <br />Area D $ 3.31 / sq. ft. <br />Area E $ 2.01 / sq. ft. <br />Area F $ 1.81 / sq. ft.
The URL can be used to link to this page
Your browser does not support the video tag.