My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Appropriation Adjustment and Agreement for Safe Routes to Parks and Wheelchair Assesment Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
12/02/2025
>
Item 14 - Appropriation Adjustment and Agreement for Safe Routes to Parks and Wheelchair Assesment Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 12:05:56 PM
Creation date
11/26/2025 10:06:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
12/2/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 of 18 <br />ATTACHMENT B <br />CHANGES FROM APPLICATION <br />Describe all material differences between the scope, schedule, and budget described in the application and the scope, <br />schedule, and budget described in Article 3. The purpose of Attachment B is to clearly and accurately document any <br />differences in scope, schedule, and budget to establish the parties’ knowledge and acceptance of those differences. <br />See Article 11 for the Statement of Work, Schedule, and Budget Changes. If there are no changes, please insert <br />“N/A” in Section 3.3 of the table. <br /> <br />Scope: N/A <br /> <br />Schedule: The schedule times in block 6 of page one and in Article 3.2 of this agreement are different from the <br />schedule in the application narrative and SF-424 submitted with the application materials. The schedule time frame <br />was adjusted to align with the anticipated grant execution and schedule contingency, and to complete a thorough <br />comprehensive safety action plan. <br /> <br />Budget: N/A <br /> <br />The table below provides a summary comparison of the project budget. <br /> <br />Fund Source <br />Application Section 3.3 <br />$ % $ % <br />Previously Incurred Costs <br />(Non-Eligible Project Costs) <br />Federal Funds N/A <br />Non-Federal Funds N/A <br />Total Previously Incurred Costs N/A <br />Future Eligible Project Costs <br />SS4AFunds N/A <br />Other Federal Funds N/A <br />Non-Federal Funds N/A <br />Total Future Eligible Project <br />Costs N/A <br />Total Project Costs N/A <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.