My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTH COAST PLAZA (2)
Clerk
>
Contracts / Agreements
>
S
>
SOUTH COAST PLAZA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 10:21:45 AM
Creation date
12/9/2025 9:01:13 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTH COAST PLAZA
Contract #
A-2025-192
Agency
Planning & Building
Council Approval Date
10/7/2025
Expiration Date
11/6/2045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
months and one date from the issuance of the Certificate of Occupancy for the third Specific <br />Plan Phase, then Community Benefit No. 4 shall accrue simple interest at a rate of five percent <br />(5%) per annum until such time as it is paid to the City. Developer may commence construction <br />of the Specific Plan Phases in any order. Notwithstanding the Specific Plan Phase order, <br />Community Benefit Payment No. 1 shall be paid prior to or concurrent with the issuance of the <br />first demolition permit in furtherance of any Specific Plan Phase. <br />4.2.2. Project Open Space. in accordance with the Specific Plan, Owner shall <br />construct, own, and maintain the Project Open Space. <br />(a) Owner shall design the Project Open Space to promote biodiversity, <br />extend thermal comfort, and to promote biophilic design, health, and wellness. <br />(b) Owner shall provide a total minimum of two (2) free on -site events per <br />year for the general public (e.g., concerts or farmers markets) including programming on <br />sustainability and wellness, subject to Force Majeure events, as follows: a minimum of two (2) <br />free events per year shall be provided commencing one year after the completion of Specific Plan <br />Phase One as set forth in section 6.3.10 of the Specific Plan. Owner's obligation under this <br />Section shall terminate after 25 years after the commencement of the first free on -site event or <br />upon termination of this Agreement whichever occurs later. <br />(c) Owner shall record one or more open space easements against the <br />Property for the benefit of the City concurrent with the recordation of the subdivision maps that <br />implement a given Project Phase or Development phase, as contemplated by the Project <br />Approvals. <br />(d) City shall provide Owner a credit against its park and open space fee <br />obligations (e.g., Park Acquisition and Development Fee) for the hard and soft cost of all land, <br />improvements, construction, operation, and maintenance associated with the Project Open Space. <br />In the event the Project Open Space is less than 7.5 acres, Owner must satisfy any required park <br />and recreation fees or other obligations (including those specified in Chapter 35, Article IV of the <br />Santa Ana Municipal Code) for the amount of the acreage shortfall as calculated by the City. <br />4.2.3. Construction Standards. <br />(a) Leadership in Energy and Environmental Design (LEED). The Project <br />shall be constructed to a minimum LEED Silver standard, as established by the U.S. Green <br />Building Council. <br />(b) Water Conservation. The Project shall include high -efficiency irrigation, <br />native drought -tolerant plantings, low -flow plumbing fixtures, and Energy Star equipment and <br />appliances. <br />(c) Electric Vehicle ("EV") Parking. No less than 5% of all structured <br />parking stalls in the Project shall be equipped with EV chargers. No less than 10% of all parking <br />stalls located within the parking structures shall be EV ready with sufficient electrical <br />infrastructure to enable the future installation of EV conduit and chargers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.