Laserfiche WebLink
Bella Terra Residential Community and Temple Project <br /> • Electronic Copy of the Draft and Final NOD <br /> • Filing the NOD with the County Clerk Recorder <br /> • Submitting the Final IS/MND, NOD, and NOCtoSCH <br /> Subtask3.4 Mitigation Monitoring and Reporting Program <br /> Through the course of IS/MND preparation, if mitigation measures are identified,in compliance <br /> with Section 21081.6 of the California Public Resources Code, Psomas will prepare a Mitigation <br /> Monitoring and Reporting Program (MMRP)as part of the Final IS/MND document.The MMRP will <br /> be prepared in matrix format and will provide the timing and responsibility for each mitigation <br /> measure. It should be noted that, later duringthe public hearings,if the Planning Commission or <br /> City Council modify the Project and/or recommend standard conditions of approval/mitigation <br /> measures for the proposed Project, Psomas will revise the MMRP. However,substantial <br /> modifications to the MMRP are not assumed in the SOW and fees for this Project. <br /> Subtask3.4 Deliverables <br /> • Electronic Copy(email)of the Draft and Final MMRP <br /> TASK4 PROJECT MANAGEMENT, MEETINGS,AND PUBLIC HEARINGS <br /> Subtask4.1 Project Management <br /> Psomas will be responsible for managing the CEQA process for document(Addendum or IS/MND). <br /> This includes ongoing coordination with the City and Project team to ensure compliance with the <br /> SOW and schedule and to ensure that information is disseminated,as necessary. <br /> Subtask 4.1 Deliverables <br /> • Project Management—Duration of Project <br /> Subtask 4.2 Project Meetings <br /> This task includes attendance at up to two coordination meetings(virtual or in-person), as <br /> necessary,with the City,the Applicant,and Project team (in addition to the Project Kick-Off <br /> meeting).This SOW assumes that the Principal-in-Chargo and Project Manager will attend all <br /> meetings(three hours each,which includes preparation and travel time). <br /> Additional meeting attendance will be billed on a time and materials basis, based on hourly rates <br /> and subject to prior approval. <br /> Subtask 4.2 Deliverables <br /> • Two Meetings with the City and Project Team <br /> Subtasl<4.3 Public Hearings <br /> Psomas will attend the Planning Commission and City Council hearings for a total of two public <br /> hearings(one Planning Commission and one City Council). Psomas will be available to provide <br /> advice and input to the City and address questions regarding CEQA,,the environmental review <br /> process; and the findings of the environmental document, as appropriate.The preparation of visual <br /> aids for the public hearings are not included in this SOW.This task assumes public hearings will be <br /> RAProposa1S1SnntAna13o11e TerrWIneffleRo 7erroJSMNo-022425.docx A-8 Scope of Work <br />