My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (16)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 9:43:13 AM
Creation date
12/10/2025 1:47:16 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-194-15B
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bella Terra Residential Community and Temple Project <br /> Psomas will also review the Project plans,design,and Traffic Memorandum to evaluate operational <br /> noise impacts to offsite sensitive receptors (i.e.,the residential units located to the north, south, <br /> east,and west). Onsite noise sources such as the operation of HVAC units and common <br /> residential activities will be qualitatively evaluated against the standards contained in the City's <br /> General Plan and Noise Ordinances. Increases in traffic noise on local roadways will also be <br /> discussed and quantified. If mitigation measures are required to minimize noise and vibration <br /> impacts, recommend measures will be coordinated with the City. Lastly,a discussion on aircraft <br /> noise emanating from the John Wayne Airport will be included,even though the Airport is located <br /> over five miles southeast of the Project site.A Noise section will be developed summarizing the <br /> findings of the analysis,and the support data and calculations will be provided as an appendix. <br /> Transportation <br /> Psomas will provide a Traffic Memorandum for the Bella Terra development;a Traffic Impact <br /> Analysis(TIA) is not anticipated to be required due to the size of the Project. The Project is <br /> expected to generate 11 net peak hour trips and 128 net daily trips. Based on City of Santa Ana <br /> guidelines,the Project will screen out of Vehicle Miles Traveled (VMT)due to its location in a low- <br /> VMT area. Psomas will provide a Memorandum to document the screening and additional discuss, <br /> as necessary. The Memorandum will include the following: <br /> • A description of existing transportation facilities and traffic control in the immediate <br /> Project vicinity <br /> • A discussion of Project site access <br /> • Trip generation estimates for the Project <br /> • A discussion of VMT screening <br /> • Res ponsos to the four CEQA transportation questions <br /> A 24-hour count will be conducted on West Hazard Avenue along the frontage of the Project to assist <br /> with the air quality and noise analyses. No analysis or traffic design is assumed in this SOW. If the <br /> City determines that a TIA is required, a Side Letter Amendment will be required.This process would <br /> require re-submission to legal for review and signatures. <br /> 5ubtask2.2 Peer Review of Existing Technical Studies <br /> As indicated above,we assume a number of studies (i.e., Hydrology and Water Quality, <br /> Geotechnical, and Phase I ESA) may have been prepared by the Applicant's consultants for the <br /> Project. If these reports are available and provided to Psomas,we will conduct a review of each of <br /> the studies for CEQA adequacy and prepare a Memorandum summarizing the comments and <br /> recommendations, as necessary. <br /> Subtask2.2 Deliverables <br /> • Electronic Copies(email)of Peer Review Memorandum (for existing studies,as available) <br /> RAPreposHMSan1AnaZeAa TerralFrnaMaKa Torte ISMND-022425.doox A-5 Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.