My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MUSCO SPORTS LIGHTING, LLC (2)
Clerk
>
Contracts / Agreements
>
M
>
MUSCO SPORTS LIGHTING, LLC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 4:06:39 PM
Creation date
12/15/2025 4:05:52 PM
Metadata
Fields
Template:
Contracts
Company Name
MUSCO SPORTS LIGHTING, LLC
Contract #
A-2025-178
Agency
Public Works
Council Approval Date
10/21/2025
Expiration Date
12/31/2026
Insurance Exp Date
7/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s . <br /> 11. Provide startup and aiming as required to provide complete and operating sports lighting system, <br /> 12. Installation to commence upon delivery and proceed without interruption until complete. Notify Musco <br /> immediately of any breaks in schedule or delays. <br /> 13. Ground restoration over trenches to match adjacent landscape/turf. <br /> Foundations, Poles,and Luminaires: <br /> 1. Mark and confirm pole locations per the aiming diagram provided. If there are any issues,immediately notify your <br /> Musco Project Manager. <br /> 2. Provide labor,materials,and equipment to install(10) LSS foundations as specified on Layout and per the stamped <br /> foundation drawings. <br /> 3. Remove spoils from site and deposit at City yard. <br /> 4. Provide labor,materials,and equipment to assemble(66)Musco TLC-LED luminaires for the field lighting,electrical <br /> component enclosures, poles,and pole harnesses. <br /> 5. Provide labor, materials,and equipment to assemble(20)TLC-LED 550 area-light luminaires. <br /> 6. Provide labor,equipment,and materials to erect(10)dressed L.SS Poles and aim utilizing the pole alignment beam. <br /> Electrical: <br /> 1. Provide labor,materials,and equipment to remove/dispose of existing switchboard and concrete equipment pad. <br /> 2. Provide labor, materials,and equipment to form and pour new concrete pad for new switch-gear;provide/install <br /> new panels, breakers,and new switch-gear enclosure on new concrete pad near restroom building, <br /> 3. Provide labor,materials,and equipment to install all underground conduit,wiring,pull boxes etc.and terminate <br /> wiring as required for the sports lighting and area lighting;dedicated circuit per pole for the sports lighting,area <br /> lights on one circuit. <br /> 4. Provide as-built drawings on completion of installation. <br /> Control System: <br /> 1. Provide labor, equipment,and materials to install Musco control and monitoring cabinet(s)and terminate all <br /> necessary wiring. <br /> 2. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer for 120 V control circuit if not available. <br /> 3. Check all zones to make sure they work in both auto and manual mode. <br /> 4. Commission Control-Link'by contacting Control-Link Central'"at 877-347-3319. <br /> 0000 <br /> 2016.2023 M�sw Sports Lghting,LLG•FA-2766-enUS-74 <br /> Misc©,. <br /> 4of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.