My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UNITED STATES DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
Clerk
>
Contracts / Agreements
>
U
>
UNITED STATES DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 4:10:31 PM
Creation date
12/15/2025 4:10:18 PM
Metadata
Fields
Template:
Contracts
Company Name
UNITED STATES DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
Contract #
A-2025-217
Agency
Public Works
Council Approval Date
12/2/2025
Expiration Date
9/30/2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall make every effort necessary to avoid any delays on each of the project schedules. <br /> Consultants shall notify the City Engineer as soon as any potential delay on any portion of <br /> contract work is known or identified. Consultants shall work together in a good faith effort to <br /> ensure projects are delivered in an efficient, effective, safe, and timely manner. <br /> 13. Final Plan Report: Final report shall include but not be limited to the following: <br /> i. Introduction <br /> ii. Relationship of this document to existing documents <br /> iii. Collision analysis <br /> iv. Toolbox of potential street improvements <br /> v. Recommended improvements <br /> vi. Cost estimates <br /> vii. Prioritization <br /> viii. Matrix of proposed countermeasures <br /> ix. Appendices (include all relevant data) <br /> SUMMARY OF PRODUCTS <br /> The required products, which are to be delivered to the Traffic Engineering section of the City of Santa <br /> Ana Public Works Agency, shall be as follows: <br /> • All data collection information for each street segment/intersection. <br /> • The draft Safe Routes to Parks and Wheelchair Assessment Plan report. (electronic) <br /> • The final Safe Routes to Parks and Wheelchair Assessment Plan report. (10 hard copies, one <br /> electronic) <br /> All written reports, information, data, charts, tables,maps, drawings, etc. in electronic format acceptable <br /> to the City of Santa Ana. <br /> 3.2 Project's Estimated Schedule. <br /> Supplemental Planning Schedule <br /> Milestone Schedule Date <br /> Planned NEPA Completion Date: October 7, 2024 <br /> Planned Draft Plan Completion Date: June 30, 2028 <br /> Planned Final Plan Completion Date: July 31, 2028 <br /> Planned Final Plan Adoption Date: August 31, 2028 <br /> Planned SS4A Final Report Date: September 30, 2028 <br /> 3.3 Project's Estimated Costs. <br /> (a) Eligible Project Costs <br /> 6of18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.