My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 10.27.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 10.27.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2025 9:39:17 AM
Creation date
12/16/2025 9:38:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP No. 1982-18-MOD-1 – Forty Martyrs Armenian Church Middle School (5311 W. <br />McFadden Avenue) <br />October 27, 2025 <br />Page 4 <br /> <br /> <br />Traffic and Pick-Up/Drop-Off Operations <br /> <br />The school’s current enrollment of 180 students is managed through staggered dismissal <br />times that effectively distribute pick-up activity throughout the afternoon. Standard <br />dismissal occurs at 3:10 p.m. for kindergarten through sixth grades. Early dismissal <br />happens before noon or between 2:00 p.m. and 3:00 p.m. to avoid disrupting nap time for <br />students in pre-kindergarten. Approximately 30 preschool students are picked up during <br />early dismissal. Additionally, about 40 students in after-school programs are picked up <br />between 3:30 p.m. and 5:30 p.m. Operational procedures, including staff-supervised <br />release of students and on-site monitoring by security personnel, ensure that drop-off and <br />pick-up activities remain orderly and efficient. <br /> <br />The designated pick-up and drop-off area for pre-kindergarten and kindergarten students <br />is located on the adjacent property at 5305 W. McFadden Avenue (APN: 108-073-16), <br />which is occupied by the Harut Barsamian Armenian Center. As documented in the <br />Focused Traffic Impact Report (Exhibit 7), the church and school campus maintain a <br />shared access agreement with the Armenian Center that allows use of the site for student <br />pick-up and drop-off operations. The shared access agreement optimizes on-site <br />circulation, distributes vehicle activity between two access points, and minimizes queuing <br />along McFadden Avenue. The pick-up and drop-off operations do not interfere with the <br />Armenian Center’s hours of operation, as the center primarily operates during evening <br />hours and weekends when school-related traffic is not present. <br /> <br />Pick-up and drop-off for first through sixth grade students occur within the parking lot <br />located directly in front of the existing school building. This configuration allows for grade- <br />level separation of circulation patterns, improves traffic flow within the campus, and <br />reduces the potential for on-street congestion or conflicts with adjacent land uses. <br /> <br />The proposed Project requires 110 parking spaces subject to Sections 41-1400 and 41- <br />1411 of the SAMC for both the school and the church uses. However, the subject site is <br />located within 0.5 mile of four major transit stations. Two stops are located along the east <br />and west side of Euclid Street and the other two stops are located on the north and south <br />side of McFadden Avenue. Therefore, the site qualifies for AB 2097 parking relief, and <br />the proposed 88 parking spaces will not require the need of a variance. <br /> <br />The total parking requirement for the combined uses consists of 36 spaces for the existing <br />school and the proposed new school building and 74 spaces for the church. During <br />regular school hours, when the church is not in operation, 48 parking spaces are available <br />on-site, exceeding the number required for school use. Conversely, during church <br />services and events, a total of 88 parking spaces are available, which surpasses the 74 <br />spaces required for the church. As illustrated on the Parking Demand Analysis (Exhibit <br />8), the parking supply onsite will provide adequate parking to support the existing school <br />and church land uses and the new proposed school building. <br /> <br />Project Background <br /> <br />In 1982, the Planning Commission approved CUP No. 1982-18 and Variance No. 1982- <br />20, allowing the construction of a new church building and a private school designed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.