Laserfiche WebLink
<br />LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-25-4923-1 <br /> Cristo Rey Orange County High School, Santa Ana <br />N:\4900\2254923 - Cristo Rey Orange County High School, Santa Ana\Report <br />3 <br />2.0 PROJECT DESCRIPTION AND LOCATION <br />The Project site is situated on the southeast quadrant of Harbor Boulevard and Lake Center Drive <br />within an existing business park at 3601 – 3631 South Harbor Boulevard consisting of <br />approximately 150,792 square-feet (SF) within four (4) buildings. Figure 2-1 presents an aerial <br />depiction of the existing site. The current occupancy is detailed by building as follows: <br />Building Size (SF) Occupancy (SF) Vacancy (SF) <br />3601 36,065 18,528 17,537 <br />3611 45,148 24,423 20,725 <br />3621 45,162 20,605 24,557 <br />3631 24,417 21,506 2,911 <br />Total 150,792 85,062 65,730 <br /> <br />The proposed Project will consist of re-occupying Building 3611 (45,148 SF) and the second floor of <br />Building 3601 (18,032 SF) for a total of 63,180 SF as a private high school with up to a maximum of <br />500 students at buildout. This high school is being relocated from their existing site within the <br />Immaculate Heart of Mary Catholic church site at 2204 McFadden Avenue in the City of Santa Ana <br />with a current enrollment of 140 students. Figure 2-2 presents the proposed site plan for the Project, <br />prepared by MJP Architects, which shows the proposed High School development. Access to the <br />Project site will continue to be provided via the two (2) existing full access unsignalized driveways <br />along SOCO Harbor Drive. <br />The draft bell schedule for the proposed high school indicates a school start of 8:10 AM and school <br />ending at 3:10 PM. <br />2.1 Pedestrian Circulation <br />Pedestrian circulation will be provided via existing public sidewalks along Sunflower Avenue, <br />Harbor Boulevard, and Lake Center Drive bordering the project site. The proposed Project will <br />protect the existing sidewalk along the project frontage and if necessary, repair or reconstruct <br />sidewalks along the project frontage per the City’s request. Figure 2-2 illustrates the proposed <br />Project’s internal walkway and pedestrian circulation which connects to the public sidewalk system <br />via Harbor Boulevard. The proposed Project plans to demolish the existing surface parking area <br />between Buildings 3601 and 3611 to provide a pedestrian plaza for the school, to include covered <br />outdoor dining and two (2) basketball courts. <br />Some students are anticipated to travel to/from school via public transportation and will utilize <br />OCTA Route 43 via the existing bus stops located on Harbor, just north and south of Lake Center <br />Drive. As part of the proposed Project, yellow ladder school crosswalks will be striped on all legs at <br />the intersection of Harbor Boulevard and Lake Center Drive to accommodate the increase in student <br />activity at the intersection. These improvements are subject to the review and approval by the Cities <br />of Santa Ana and Costa Mesa due to joint jurisdiction. <br />