Laserfiche WebLink
Resolution No. 2025-35 <br /> Page 3 of 14 <br />Strict application of these requirements would eliminate <br />essential buildable area, preclude the minimum 36 on-site <br />parking spaces, disrupt required drive-aisle widths, and <br />potentially require abandonment and demolition of the <br />structurally sound basement, an outcome that yields no public <br />benefit and would effectively prevent reasonable <br />redevelopment of the property. These circumstances <br />demonstrate that, due to its unique size, shape, constraints <br />imposed by the existing basement, and corner-lot <br />configuration, strict adherence to the zoning ordinance would <br />deprive the property of development opportunities and <br />privileges commonly enjoyed by comparable parcels in the P <br />zone. <br />2. That the granting of a variance is necessary for the preservation and <br />enjoyment of one (1) or more substantial property rights. <br />Granting the requested variances is necessary to allow the <br />Applicant to exercise substantial property rights enjoyed by <br />other properties within the P zoning district. Specifically, the <br />right to reasonably redevelop the site with a permitted <br />institutional use consistent with the underlying zoning and <br />General Plan designation. Churches and other assembly uses <br />are expressly allowed in the P district with approval of a <br />Conditional Use Permit. However, strict application of the <br />required 15-foot front and street-side setbacks, 15-foot <br />landscaped yards, 5-foot interior side landscaped area, 10- <br />foot rear landscaped buffer, and 108 on-site parking stalls <br />would make development of any functional religious institution <br />physically infeasible on this uniquely constrained lot. <br />Because the subject property is significantly smaller than <br />typical office parcels along Seventeenth Street, has double- <br />frontage, and contains an existing 11,313-square-foot <br />basement that dictates the feasible building footprint and <br />circulation pattern, the site cannot meet all setback, <br />landscaping, and parking standards without eliminating the <br />usable building area required for assembly space, ADA- <br />compliant circulation, offices, and support functions. Strict <br />adherence to these standards would result in a building so <br />reduced in size and functionality that no meaningful religious <br />assembly use could be accommodated. It would also require <br />removal of the structurally sound basement, an extraordinary <br />burden not faced by similarly zoned parcels. <br />By granting the variances, the property owner can utilize the <br />site in a manner consistent with other properties in the P <br />zoning district and in alignment with the General Plan’s <br />Professional and Administrative Office (PAO) designation,