Laserfiche WebLink
PROJECT TITLE: <br />Alley Improvement Program <br />PROJECT CATEGORY: <br />Street Improvements <br />Allev Rehabilitation <br />LOCATION MAP <br />CITYWIDE <br />AGENCY: <br />Public Works <br />A <br />CITY OF SANTA ANA FY 25126CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will provide for the removal of existing damaged pavement <br />and reconstruction with Portland Cement Concrete (PCC) for alleys <br />citywide. <br />L <br />PROJECT NEED: <br />The Citywide network of Portland Cement Concrete (PCC) and asphalt alleys <br />is in extreme state of deterioration with the presence of numerous potholes, <br />cracking, spalling, and uplifting. PCC pavement will eliminate the drainage <br />problems associated with the asphalt pavement and provide a longer life for <br />the alleys. <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 1,389,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />Engineering 111,000 - - - - - - <br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GENERAL FUND 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />DIVISION: <br />CIP Engineering <br />i <br />TOTAL 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />DATE: <br />11-Dec-2025 <br />