|
Lii)e iLeni�
<br />Discount Terms No Discount
<br />Item*
<br />Item lode Type
<br />Item Description
<br />UOM
<br />OTY
<br />Unit Price
<br />LFne Total
<br />Rasponee Comment
<br />TOTAL BASE BID (Items 1.13)
<br />$674,103.40
<br />1
<br />1
<br />Remove Underground Storage Tanks
<br />LS
<br />1
<br />533,064.00
<br />533,054.00
<br />Yes
<br />2
<br />2
<br />Remove Above Ground Fuel Storage Tank/Dispenser System
<br />LS
<br />1
<br />53.444.00
<br />53,444.0o
<br />Yes
<br />3
<br />3
<br />Remove Existing Metal Enclosure
<br />LS
<br />1
<br />53,31&00
<br />53,316.00
<br />Yes
<br />4
<br />4
<br />Concrete calssonsfstructural footing Foundations
<br />LS
<br />1
<br />$37.049.22
<br />$37,049.22
<br />Yes
<br />5
<br />5
<br />Install Above Ground FUR[ Storage Tsnk/Dispenser System
<br />LS
<br />1
<br />5121.261.22
<br />5123,267.22
<br />Yes
<br />6
<br />6
<br />Install Portable DEF Storage Tank
<br />LS
<br />1
<br />525,147.76
<br />$25,147.75
<br />Yes
<br />7
<br />7
<br />Install metal bo114rds
<br />Ls
<br />1
<br />$10,907.22
<br />$10,902.22
<br />Yes
<br />9
<br />a
<br />Install Metal Structure/Canopy with metal deeking and metal roofing
<br />1.5
<br />1
<br />$132,263.22
<br />$132,263.22
<br />Yes
<br />9
<br />9
<br />Fire extinguishers
<br />LS
<br />1
<br />5420.00
<br />5420.00
<br />Yes
<br />10
<br />t➢
<br />Product pipes, vaparpipes and Rttings and accessories, pipe support
<br />L5
<br />t
<br />511.76322
<br />541,763.22
<br />Y4s
<br />11
<br />11
<br />Transition sumps 6 vapor pat
<br />LS
<br />1
<br />512,600A0
<br />S12,600.00
<br />Yes
<br />I
<br />12
<br />Vaed*rReet TLS 3000
<br />LS
<br />1
<br />S40,a4122
<br />540,641.22
<br />Yes
<br />13
<br />73
<br />Unleaded. Diesel Not dispenser, 2•hos4
<br />LS
<br />1
<br />$42.69622
<br />$42,69622
<br />Yes
<br />14
<br />14
<br />Dispensing pump control panel
<br />LS
<br />1
<br />55,943.00
<br />SS,943.00
<br />Yes
<br />1S
<br />is
<br />Fuel turbines
<br />LS
<br />1
<br />S16,69622
<br />S161896.22
<br />Yes
<br />14
<br />t6
<br />Electric duct bank For signal and power, pull boxes, cable troy, exterior ate,ctriul panel
<br />LS
<br />1
<br />529,27322
<br />529,273.ZZ
<br />Yes
<br />17
<br />17
<br />Power, central and communication cenduRs, cables, setts and support
<br />LS
<br />1
<br />S17.14122
<br />517,141.22
<br />Yes
<br />It
<br />to
<br />Concrete pavement removal/Installation
<br />IF
<br />1100
<br />SSOAO
<br />S55,ameo
<br />Yes
<br />19
<br />19
<br />Fencing and Barricades
<br />LS
<br />1
<br />S17,36T22
<br />517,367.22
<br />Yes
<br />20
<br />20
<br />Dlspesal of censtrvctlen materlaSs
<br />LS
<br />1
<br />521,55T22
<br />SZ1,5572Z
<br />Yes
<br />21
<br />21
<br />Sbee0149, shoring, bracing and excavation protection
<br />LS
<br />1
<br />$13,224.00
<br />$13,224.00
<br />Yes
<br />22
<br />22
<br />As -Built Plans
<br />LS
<br />1
<br />55,000.00
<br />$5,000.00
<br />Yes
<br />23
<br />23
<br />Construction Permit
<br />LS
<br />1
<br />$10.000.00
<br />510,000.00
<br />Yes
<br />24
<br />24
<br />OCUCAFees
<br />LS
<br />1
<br />55,000.00
<br />95.000.00
<br />Yes
<br />
|