My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Construction Contract for Fuel Station Replacement Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
01/20/2026
>
Item 22 - Construction Contract for Fuel Station Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:49:33 PM
Creation date
1/14/2026 9:43:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/20/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Addendum No. Four <br />PROPOSAL <br />PROJECT NO.: 24-6053 <br />SANTA ANA FIRE STATION 74 FUEL STATION REPLACEMENT <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: GEMS Environmental Management Services, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove Underground Storage Tanks <br />1 <br />LS <br />$ <br />$ <br />33,084.00 <br />33,084.00 <br />2 <br />Remove Above Ground Fuel Storage <br />1 <br />LS <br />$ <br />$ <br />Tank/Dispenser System <br />3,444.00 <br />3,444.00 <br />3 <br />Remove Existing Metal Enclosure <br />1 <br />LS <br />$ <br />$ <br />3,318.00 <br />3,318.00 <br />4 <br />Concrete caissons/structural footing <br />1 <br />LS <br />$ <br />$ <br />foundation <br />37,049.22 <br />37,049.22 <br />5 <br />Install Above Ground Fuel Storage <br />1 <br />LS <br />$ <br />$ <br />Tank/Dispenser System <br />123,287.22 <br />123,287.22 <br />6 <br />Install Portable DEF Storage Tank <br />I <br />LS <br />$ <br />$ <br />25,147.76 <br />25,147.76 <br />7 <br />Install Metal Bollards <br />1 <br />LS <br />$ <br />10,907.22 <br />$ <br />10,907.22 <br />8 <br />Install Metal Structure/Canopy with <br />1 <br />LS <br />$ <br />$ <br />metal decking and metal roofing <br />132,263.22 <br />132,263.22 <br />9 <br />Fire extinguishers <br />1 <br />LS <br />$ <br />$ <br />420.00 <br />420.00 <br />10 <br />Product pipes, vapor pipes and fittings <br />1 <br />LS <br />$ <br />$ <br />and accessories, pipe support <br />11,763.22 <br />11,763.22 <br />11 <br />Transition sumps & vapor pot <br />1 <br />LS <br />$ <br />$ <br />12,600.00 <br />12,600.00 <br />12 <br />Veeder-Root TLS 450 <br />1 <br />LS <br />$ <br />$ <br />40,841.22 <br />40,841.22 <br />13 <br />Unleaded + Diesel fuel dispenser, 2-hose <br />1 <br />LS <br />$ <br />$ <br />42,696.22 <br />42,696.22 <br />14 <br />Dispensing Pump Control Panel <br />1 <br />LS <br />$ <br />$ <br />5,943.00 <br />5,943.00 <br />P-1 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.